Please click the links below to view the current projects:
CONSULTATION BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF DANGO BRIDGE (B1372) AND BEDLANE BRIDGE (B1330) SITUATED ALONG THE P393 (R34) ROAD BETWEEN NKWALENI PASS (KM0.0) AND EMPANGENI (KM 24.0) IN KWAZULU-NATAL PROVINCE.
Review Dates: 6 September 2017 to 6 October 2017
Documents |
|
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
DRAFT CONSULTATION BASIC ASSESSMENT REPORT FOR THE PROPOSED REHABILITATION OF THE EXISTING P50-1 FROM KM 17,34 TO KM 26,0, EMPANGENI, KZN – INVITATION TO COMMENT.
The KwaZulu-Natal Department of Transport has appointed Royal HaskoningDHV to act as the independent Environmental Assessment Practitioner (EAP) for the Basic Assessment (BA) study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2014)(as amended), please find attached a draft consultation Basic Assessment Report and associated documents for your review and comment. Please be informed that the period for review is 30 calendar days from 28 August 2017 to 27 September 2017.
Due Date for Comments: 27 September 2017
Documents |
|
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
DRAFT CONSULTATION BASIC ASSESSMENT REPORT FOR THE PROPOSED REHABILITATION OF THREE CULVERTS ALONG THE EXISTING P449 FROM KM 0,0 TO KM 6,0, JOZINI, KZN - INVITATION TO COMMENT.
The KwaZulu-Natal Department of Transport has appointed Royal HaskoningDHV to act as the independent Environmental Assessment Practitioner (EAP) for the Basic Assessment (BA) study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2014)(as amended), please find attached a draft consultation Basic Assessment Report and associated documents for your review and comment. Please be informed that the period for review is 30 calendar days from 7 August 2017 to 6 September 2017.
Due Date for Comments: 6 September 2017
Documents |
|
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
DRAFT CONSULTATION BASIC ASSESSMENT REPORT FOR THE PROPOSED REHABILITATION OF A CULVERT ALONG THE EXISTING P230 FROM KM 37,0 TO KM 47,0, EMPANGENI, KZN - INVITATION TO COMMENT.
The KwaZulu-Natal Department of Transport has appointed Royal HaskoningDHV to act as the independent Environmental Assessment Practitioner (EAP) for the Basic Assessment (BA) study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2014)(as amended), please find attached a draft consultation Basic Assessment Report and associated documents for your review and comment. Please be informed that the period for review is 30 calendar days from 17 July 2017 to 16 August 2017.
Due Date for Comments: 16 August 2017
Documents |
|
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Consultation Basic Assessment Report for the Proposed Pongola (Mboza) River Bridge and Vehicular Approaches off District Road D1834 Invitation to comment KZN EDTEA Reference Number: DC27/0006/2017.
Royal HaskoningDHV have been appointed by the KwaZulu-Natal Department of Transport (KZN DoT) to perform feasibility studies and to investigate, design, and manage the construction for the proposed Pongola (also referred to commonly as the Mboza) River Bridge (Bridge No. 3513). The proposed bridge is located between Ward 10 of Jozini Local Municipality and Ward 13 of the uMhlabuyalingana Local Municipality. The purpose of the bridge will be to link the two (2) communities within the uMkhanyakude District Municipality, KwaZulu-Natal.
The proposed site (GPS co-ordinates: 27`11'17"S 32`14'20"E) is located on the Pongola River approximately 3.5 km to the west of the Mboza Clinic off District Road D1834. The nearest bridge to the site and the associated local communities is 12 km south of this proposed crossing point.
A pedestrian bridge, comprising of a suspended structure with abutments constructed adjacent to the riverbanks, was previously authorised at the same location (Ref: DC27/0009/2014, NEAS: KZN/EIA/0001216/2013) on 27th November 2013.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations 2014 (as amended in 2017), the draft Consultation Basic Assessment Report and associated documents have been made available for public review and comment for a period of 30 calendar days from 14 July 2017 2017 to 14 August 2017. Please find attached the draft Consultation Basic Assessment Report and associated documents for your review and comment.
Available for Public Review: 14 July 2017 - 14 August 2017
Documents |
|
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
PROPOSED CANELANDS EXTENSION, eTHEKWINI MUNICIPALITY, KZN (EDTEA REF NO: DM/0031/2012).
Notice is hereby given in terms of the Environmental Impact Assessment Regulations (2010) published in Government Notice No. R. 543 to No. R. 546 (as amended), in terms of Section 10(2) of the National Environmental Management Act (Act No. 107 of 1998), of the Environmental Authorisation (EA) by the KwaZulu-Natal Department of Economic Development, Tourism and Environmental Affairs (KZN EDTEA) issued on 21 June 2017 to authorise the initiative by Tongaat Hulett Developments (Pty) Ltd, to develop the Canelands Extension in the eThekwini Municipality.
In accordance with sub-regulation 10(2) of the EIA Regulations, GN R. 543, June 2010, all interested and affected parties are hereby notified of the decision by the KZN EDTEA to authorise this application.
Your attention is hereby drawn to the fact that an appeal may be lodged against the decision in accordance with regulation 4(2) of the National Appeal Regulations, 2014, in terms of which an appellant may submit an appeal according to the prescribed process, within twenty (20) days from the date of notification of this decision (i.e. 19 July 2017).
Documents |
|
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
NOTICE OF ENVIRONMENTAL AUTHORISATION: BASIC ASSESSMENT FOR THE UMFOLOZI RIVER BRIDGE AND LINK ROAD, KWAZULU-NATAL (REF- DC28/0010/2016).
The KwaZulu-Natal (KZN) Department of Economic Development, Tourism and Environmental Affairs (EDTEA) has issued an Environmental Authorisation (EA) to the KZN Department of Transport (DoT) , in respect of the aforementioned project in terms of the National Environmental Management Act, 1998 (Act No 107 of 1998) (as amended) and the Environmental Impact Assessment (EIA) Regulations, 2014 (GN R.982). The EA was issued on 13 June 2017.
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from (a) The date that the notification of the decision for an application for an EA was sent to the registered Interested and Affected Parties (I&APs) by the applicant
Documents |
|
EA uMfolozi River Bridge and link Roads.pdf |
Download |
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
Amended Basic Assessment Report for the proposed Bulk Infrastructure Project in Nkandla, KwaZulu Natal Province (Version 3).
Available for Public Review: 01 June 2017 to 30 June 2017
Documents |
|
Schedule of Amendments.pdf |
Download |
Basic Assessment Report.pdf |
Download |
EA uMfolozi River Bridge and link Roads.pdf |
Download |
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Map 1.jpg |
Download |
Appendix A2-Locality Map 2.pdf |
Download |
Appendix A3-Nkandla sensitivity.jpg |
Download |
Appendix B-Photos |
|
Appendix B-Site Photographs.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Stormwater Alternative 1.pdf |
Download |
Appendix C2-Stormwater Alternative 2.pdf |
Download |
Appendix C3-Sewer Altenative 1.JPG |
Download |
Appendix C4-Sewer Alternative 2.pdf |
Download |
Appendix C5-Roads Layout.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Ecological Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix D3-Engineering Services.pdf |
Download |
Appendix F-EMPr |
|
Appendix F-EMPr.pdf |
Download |
NOTICE OF ENVIRONMENTAL AUTHORISATION: BASIC ASSESSMENT FOR THE REHABILITATION OF THE EXISTING P236 FROM KM 6.235 TO KM 14.0, UBOMBO, KWAZULU-NATAL (REF- DC27/0016/2016: KZN/EIA/0000361/2016)
The KwaZulu-Natal (KZN) Department of Economic Development, Tourism and Environmental Affairs (EDTEA) has issued an Environmental Authorisation (EA) to the KZN Department of Transport (DoT) , in respect of the aforementioned project in terms of the National Environmental Management Act, 1998 (Act No 107 of 1998) (as amended) and the Environmental Impact Assessment (EIA) Regulations, 2014 (GN R.982). The EA was issued on 08 May 2017.
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from (a) The date that the notification of the decision for an application for an EA was sent to the registered Interested and Affected Parties (I&APs) by the applicant.
Documents |
|
P236 km 6.235 to km14.00 EA.PDF |
Download |
Schedule of Amendments.pdf |
Download |
Basic Assessment Report.pdf |
Download |
EA uMfolozi River Bridge and link Roads.pdf |
Download |
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Map 1.jpg |
Download |
Appendix A2-Locality Map 2.pdf |
Download |
Appendix A3-Nkandla sensitivity.jpg |
Download |
Appendix B-Photos |
|
Appendix B-Site Photographs.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Stormwater Alternative 1.pdf |
Download |
Appendix C2-Stormwater Alternative 2.pdf |
Download |
Appendix C3-Sewer Altenative 1.JPG |
Download |
Appendix C4-Sewer Alternative 2.pdf |
Download |
Appendix C5-Roads Layout.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Ecological Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix D3-Engineering Services.pdf |
Download |
Appendix F-EMPr |
|
Appendix F-EMPr.pdf |
Download |
FINAL AMENDED ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED TINLEY MANOR SOUTHBANKS COASTAL DEVELOPMENT - INVITATION TO COMMENT KZN EDTEA REFERENCE NUMBER: DC29/0019/2011.
Tongaat Hulett Developments propose to develop the Tinley Manor Southbanks Coastal Development into a mixed-use coastal development including a large residential component. Tinley Manor Southbanks is an approximately 485 ha site, located between the coastal towns of Tinley Manor and Sheffield Beach within the KwaDukuza Municipality, KwaZulu-Natal.
Tongaat Hulett Developments has appointed Royal HaskoningDHV (previously known as SSI Engineers and Environmental Consultants) to act as the independent Environmental Assessment Practitioner (EAP) for the Environmental Impact Assessment (EIA) study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2010), please find attached a final amended Environmental Impact Assessment Report and associated documents for your review and comment. Please be informed that the period for review is 21 calendar days from 01 June 2017 to 22 June 2017.
Available for Public Review: 01 June 2017 to 22 June 2017
Documents |
|
MD1275_aEIR_F02_Tinley South Final_reduced.pdf |
Download |
MD1275_aEIR_D09_Tinley South Draft_Reduced.pdf |
Download |
P236 km 6.235 to km14.00 EA.PDF |
Download |
Schedule of Amendments.pdf |
Download |
Basic Assessment Report.pdf |
Download |
EA uMfolozi River Bridge and link Roads.pdf |
Download |
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Map 1.jpg |
Download |
Appendix A2-Locality Map 2.pdf |
Download |
Appendix A3-Nkandla sensitivity.jpg |
Download |
Appendix B-Photos |
|
Appendix B-Site Photographs.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Stormwater Alternative 1.pdf |
Download |
Appendix C2-Stormwater Alternative 2.pdf |
Download |
Appendix C3-Sewer Altenative 1.JPG |
Download |
Appendix C4-Sewer Alternative 2.pdf |
Download |
Appendix C5-Roads Layout.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Ecological Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix D3-Engineering Services.pdf |
Download |
Appendix F-EMPr |
|
Appendix F-EMPr.pdf |
Download |
Appendix A - EDTEA Correspondence |
|
App A.pdf |
Download |
Appendix B - EMPr |
|
1 - EMPr |
|
MD1275_aEMPr_D03_Tinley South Draft.pdf |
Download |
MD1275_aEMPr_F02_Tinley South EMPr Final.pdf |
Download |
B1 - THD Standard Operating Procedures |
|
THD SOPs.pdf |
Download |
B2 - Stormwater Management Plan |
|
DH0014 - Stormwater Mangement Plan-Rev 3.pdf |
Download |
B3 - Soil Management Framework Strategy |
|
SFMS March 17.pdf |
Download |
B4 - Wetland and Open Space Rehabilitation Plan |
|
1. TMSB Wet and OS Rehab Plan May 2017.pdf |
Download |
Appendix A.pdf |
Download |
Appendix B1.pdf |
Download |
Appendix B2.pdf |
Download |
Tinley Wet & OS Rehab Plan March 17.pdf |
Download |
B5 - Traffic Management Plan |
|
108498_TinleyManor Southbanks_Traffic Management Plan.pdf |
Download |
B6 - Approved Wetland Crossings, Phasing Plans and Sensitivity Maps |
|
1 - Wetland Crossing Plans.pdf |
Download |
2 - Phasing Plans.pdf |
Download |
3.1 - Sensitivity Map.jpg |
Download |
3.1 Consolidated Sensitivity Map.jpg |
Download |
3.2 - No go Map.jpg |
Download |
Appendix C - Specialist Studies |
|
1. Response letter to EDTEA.pdf |
Download |
1. Veg Assessment.pdf |
Download |
2. Appendices.pdf |
Download |
2. Revised dev scheme letter.pdf |
Download |
3. Addendum 1.pdf |
Download |
3. Tinley manor TIA Rev 3.pdf |
Download |
4. Addendum 2.pdf |
Download |
4. Tech Note 1 - Analysis of construction traffic.pdf |
Download |
5. Tech Note 2 - DoT Corresp.pdf |
Download |
6. Tech Note 3 - Phasing Plan.pdf |
Download |
C1 - Agricultural Potential Assessment |
|
Agric Potential.pdf |
Download |
C10 - Urban Planning Report |
|
20170314_rev6_ Tinley Manor Report SDP.pdf |
Download |
20170519_Tinley Manor Report SDP.pdf |
Download |
C11 - Engineering Services Report |
|
1. Eng Services Report.pdf |
Download |
Engineering Services Report.pdf |
Download |
C12 - Electrical Services Report |
|
001 - Electrical Services Report rev 5.pdf |
Download |
C13 - Visual Assessment |
|
Tinley Manor South Banks VIA rev4 21 Feb 2017 AG.pdf |
Download |
C2 - Geotechnical Assessment |
|
0. Geotech Report.pdf |
Download |
23312 - Appendix A - EXP's 1 - 25.pdf |
Download |
23312 - Appendix A - IP's 1 - 49.pdf |
Download |
23312 - Appendix A - IP's 50 - 98.pdf |
Download |
23312 - Appendix B - DCP's 1 - 92.pdf |
Download |
23312 - Appendix C - Lab Results.pdf |
Download |
CAD 23312_1ATINLEY MANOR.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage.pdf |
Download |
C5 - Wetland Assessment |
|
Wet Assessment May 17.pdf |
Download |
C6 - Estuarine Assessment |
|
1. Estuary Assessment.pdf |
Download |
Mhlali_EstImpact Report_updated_v2.pdf |
Download |
Peer Review Umhlali Estuary.pdf |
Download |
C7.1 - Coastal Assessment |
|
Coastal Assessment May 17.pdf |
Download |
Tinley Manor Southbanks Coastal Assessment.pdf |
Download |
C7.2 - Beach Access Report |
|
Coastal_beaches Access.pdf |
Download |
ORI Data Report 2008_DRAFT_280708.pdf |
Download |
C7.3 - Coastal Feasibility Study |
|
Coastal Feasibility Report.pdf |
Download |
Final Report for THD setback line phase 2.pdf |
Download |
C7.4 - Coastal Addendums |
|
Addendum 1.pdf |
Download |
Addendum 2.pdf |
Download |
Addendum 2a.pdf |
Download |
C7.5 - Coastal Assessment Peer-review |
|
Coastal Peer-review.pdf |
Download |
C8 - Socio-economic Study |
|
1 .Cover Letter.pdf |
Download |
2. SIA.pdf |
Download |
C9 - Traffic Impact Assessment |
|
3. Tinley manor TIA Rev 4.pdf |
Download |
Appendix D - Details of EAP |
|
1 - Environmental Management & Compliance Profile - 2013.pdf |
Download |
2 - Strategic Enviro Planning Assessment Profile 2014.pdf |
Download |
3 - EAP CVs.pdf |
Download |
Appendix E - Similar Activities |
|
Tinley 2010vs2014 EIA Regulations.ver4.pdf |
Download |
Tinley 2010vs2014vs2017 EIA Regulations.ver6.pdf |
Download |
Appendix F - Layout Plans |
|
1 - Concept Plan.pdf |
Download |
10 - Typical Details.pdf |
Download |
11 - Sensitivity Map.jpg |
Download |
11.1 - Sensitivity Map.jpg |
Download |
11.2 - No go Map.jpg |
Download |
12 - No Go Areas.jpg |
Download |
2 - Phasing Plans.pdf |
Download |
3 - Bulk Water.pdf |
Download |
4 - Bulk Sewer.pdf |
Download |
5 - Construction Access.pdf |
Download |
6 - Road Layout.pdf |
Download |
7 - Bulk Irrigation.pdf |
Download |
8 - Stormwater Layout.pdf |
Download |
9 - Wetland Crossing Plans.pdf |
Download |
Appendix G - Service Level Agreements |
|
SLAs.pdf |
Download |
Appendix H - Public Participation Summary Report |
|
1 - PPP Summary Report.pdf |
Download |
2 - Issues Trail.pdf |
Download |
2 - Issues Trail.pdf |
Download |
3 - Comments Received.pdf |
Download |
The Department of Environmental Affairs (DEA) has issued an Exemption to Eskom Holdings SOC Ltd (Eskom), in respect of the aforementioned project in terms of the Regulations 3 and 4 of the National Exemption Regulations (No. R.994) read with Section 24M(3) of the National Environmental Management Act (Act No. 107 of 1998) and Section 74 of the National Environmental Management: Waste Act (Act No. 59 of 2008).
The Exemption was issued on 10 February 2017 but only received on 23 February 2017. The DEA have subsequently acknowledged this administrative error and have issued a notification to extend the notification period. This notification is dated 27 February 2017 and I&APs should be notified within 12 days from the date of this notification.
In terms of Regulation 60(1) of the EIA Regulations (2010), any person wishing to appeal the granting of this Exemption must lodge a notice of intention to appeal with the Minister, within 20 days after the date of the decision i.e. on or before 20 March 2017. I&APs intending to submit a Notice of Intention to Appeal should send a copy to the Applicant and Royal HaskoningDHV as well as a notice indicating where and for what period the appeal submission will be available for inspection by the applicant within 10 days of lodging the notice. An appeal must be submitted to the Minister within 30 days after the lapsing of the 20 days contemplated in Regulation 60(1).
Documents |
|
MD1285_L01_F02_Exemption Decision Notification_r.pdf |
Download |
MD1275_aEIR_F02_Tinley South Final_reduced.pdf |
Download |
MD1275_aEIR_D09_Tinley South Draft_Reduced.pdf |
Download |
P236 km 6.235 to km14.00 EA.PDF |
Download |
Schedule of Amendments.pdf |
Download |
Basic Assessment Report.pdf |
Download |
EA uMfolozi River Bridge and link Roads.pdf |
Download |
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Map 1.jpg |
Download |
Appendix A2-Locality Map 2.pdf |
Download |
Appendix A3-Nkandla sensitivity.jpg |
Download |
Appendix B-Photos |
|
Appendix B-Site Photographs.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Stormwater Alternative 1.pdf |
Download |
Appendix C2-Stormwater Alternative 2.pdf |
Download |
Appendix C3-Sewer Altenative 1.JPG |
Download |
Appendix C4-Sewer Alternative 2.pdf |
Download |
Appendix C5-Roads Layout.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Ecological Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix D3-Engineering Services.pdf |
Download |
Appendix F-EMPr |
|
Appendix F-EMPr.pdf |
Download |
Appendix A - EDTEA Correspondence |
|
App A.pdf |
Download |
Appendix B - EMPr |
|
1 - EMPr |
|
MD1275_aEMPr_D03_Tinley South Draft.pdf |
Download |
MD1275_aEMPr_F02_Tinley South EMPr Final.pdf |
Download |
B1 - THD Standard Operating Procedures |
|
THD SOPs.pdf |
Download |
B2 - Stormwater Management Plan |
|
DH0014 - Stormwater Mangement Plan-Rev 3.pdf |
Download |
B3 - Soil Management Framework Strategy |
|
SFMS March 17.pdf |
Download |
B4 - Wetland and Open Space Rehabilitation Plan |
|
1. TMSB Wet and OS Rehab Plan May 2017.pdf |
Download |
Appendix A.pdf |
Download |
Appendix B1.pdf |
Download |
Appendix B2.pdf |
Download |
Tinley Wet & OS Rehab Plan March 17.pdf |
Download |
B5 - Traffic Management Plan |
|
108498_TinleyManor Southbanks_Traffic Management Plan.pdf |
Download |
B6 - Approved Wetland Crossings, Phasing Plans and Sensitivity Maps |
|
1 - Wetland Crossing Plans.pdf |
Download |
2 - Phasing Plans.pdf |
Download |
3.1 - Sensitivity Map.jpg |
Download |
3.1 Consolidated Sensitivity Map.jpg |
Download |
3.2 - No go Map.jpg |
Download |
Appendix C - Specialist Studies |
|
1. Response letter to EDTEA.pdf |
Download |
1. Veg Assessment.pdf |
Download |
2. Appendices.pdf |
Download |
2. Revised dev scheme letter.pdf |
Download |
3. Addendum 1.pdf |
Download |
3. Tinley manor TIA Rev 3.pdf |
Download |
4. Addendum 2.pdf |
Download |
4. Tech Note 1 - Analysis of construction traffic.pdf |
Download |
5. Tech Note 2 - DoT Corresp.pdf |
Download |
6. Tech Note 3 - Phasing Plan.pdf |
Download |
C1 - Agricultural Potential Assessment |
|
Agric Potential.pdf |
Download |
C10 - Urban Planning Report |
|
20170314_rev6_ Tinley Manor Report SDP.pdf |
Download |
20170519_Tinley Manor Report SDP.pdf |
Download |
C11 - Engineering Services Report |
|
1. Eng Services Report.pdf |
Download |
Engineering Services Report.pdf |
Download |
C12 - Electrical Services Report |
|
001 - Electrical Services Report rev 5.pdf |
Download |
C13 - Visual Assessment |
|
Tinley Manor South Banks VIA rev4 21 Feb 2017 AG.pdf |
Download |
C2 - Geotechnical Assessment |
|
0. Geotech Report.pdf |
Download |
23312 - Appendix A - EXP's 1 - 25.pdf |
Download |
23312 - Appendix A - IP's 1 - 49.pdf |
Download |
23312 - Appendix A - IP's 50 - 98.pdf |
Download |
23312 - Appendix B - DCP's 1 - 92.pdf |
Download |
23312 - Appendix C - Lab Results.pdf |
Download |
CAD 23312_1ATINLEY MANOR.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage.pdf |
Download |
C5 - Wetland Assessment |
|
Wet Assessment May 17.pdf |
Download |
C6 - Estuarine Assessment |
|
1. Estuary Assessment.pdf |
Download |
Mhlali_EstImpact Report_updated_v2.pdf |
Download |
Peer Review Umhlali Estuary.pdf |
Download |
C7.1 - Coastal Assessment |
|
Coastal Assessment May 17.pdf |
Download |
Tinley Manor Southbanks Coastal Assessment.pdf |
Download |
C7.2 - Beach Access Report |
|
Coastal_beaches Access.pdf |
Download |
ORI Data Report 2008_DRAFT_280708.pdf |
Download |
C7.3 - Coastal Feasibility Study |
|
Coastal Feasibility Report.pdf |
Download |
Final Report for THD setback line phase 2.pdf |
Download |
C7.4 - Coastal Addendums |
|
Addendum 1.pdf |
Download |
Addendum 2.pdf |
Download |
Addendum 2a.pdf |
Download |
C7.5 - Coastal Assessment Peer-review |
|
Coastal Peer-review.pdf |
Download |
C8 - Socio-economic Study |
|
1 .Cover Letter.pdf |
Download |
2. SIA.pdf |
Download |
C9 - Traffic Impact Assessment |
|
3. Tinley manor TIA Rev 4.pdf |
Download |
Appendix D - Details of EAP |
|
1 - Environmental Management & Compliance Profile - 2013.pdf |
Download |
2 - Strategic Enviro Planning Assessment Profile 2014.pdf |
Download |
3 - EAP CVs.pdf |
Download |
Appendix E - Similar Activities |
|
Tinley 2010vs2014 EIA Regulations.ver4.pdf |
Download |
Tinley 2010vs2014vs2017 EIA Regulations.ver6.pdf |
Download |
Appendix F - Layout Plans |
|
1 - Concept Plan.pdf |
Download |
10 - Typical Details.pdf |
Download |
11 - Sensitivity Map.jpg |
Download |
11.1 - Sensitivity Map.jpg |
Download |
11.2 - No go Map.jpg |
Download |
12 - No Go Areas.jpg |
Download |
2 - Phasing Plans.pdf |
Download |
3 - Bulk Water.pdf |
Download |
4 - Bulk Sewer.pdf |
Download |
5 - Construction Access.pdf |
Download |
6 - Road Layout.pdf |
Download |
7 - Bulk Irrigation.pdf |
Download |
8 - Stormwater Layout.pdf |
Download |
9 - Wetland Crossing Plans.pdf |
Download |
Appendix G - Service Level Agreements |
|
SLAs.pdf |
Download |
Appendix H - Public Participation Summary Report |
|
1 - PPP Summary Report.pdf |
Download |
2 - Issues Trail.pdf |
Download |
2 - Issues Trail.pdf |
Download |
3 - Comments Received.pdf |
Download |
Consultation Basic Assessment Report for the Proposed Upgrades to the R102 in eThekwini Metropolitan Municipality, KwaZulu-Natal
The KwaZulu-Natal Department of Transport (KZN DoT) propose upgrading the R102 in the eThekwini Metropolitan Municipality. The KZN DoT has appointed Royal HaskoningDHV to act as the independent Environmental Assessment Practitioner (EAP) for the Basic Assessment study. In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2014), the draft Consultation Basic Assessment Report and associated documents have been made available for public review and comment for a period of 30 calendar days from 11 January 2017 to 10 February 2017.
Client:KwaZulu-Natal Department of Transport
Documents |
|
R102 CBAR_Jan 2016.pdf |
Download |
MD1285_L01_F02_Exemption Decision Notification_r.pdf |
Download |
MD1275_aEIR_F02_Tinley South Final_reduced.pdf |
Download |
MD1275_aEIR_D09_Tinley South Draft_Reduced.pdf |
Download |
P236 km 6.235 to km14.00 EA.PDF |
Download |
Schedule of Amendments.pdf |
Download |
Basic Assessment Report.pdf |
Download |
EA uMfolozi River Bridge and link Roads.pdf |
Download |
Canelands Extension EA.pdf |
Download |
MD1676_F01_Mboza cBAR_27 June 2017.pdf |
Download |
MD1729_R01_D04_P230 cBAR.pdf |
Download |
MD1687_R01_D05_P449 draft cBAR.pdf |
Download |
MD1730_R01_D03_P50-1 cBAR.pdf |
Download |
MD1668_R0906_D01_P393-cBAR.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Basemap.jpg |
Download |
Appendix A2-Sensitivity Map.jpg |
Download |
Appendix A3- Topo Cadastral Map-West.jpg |
Download |
Appendix A4-Topo Cadastral Map East.jpg |
Download |
Appendix B-Site Photos |
|
SITE PHOTOS.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Bedlane bridge - GA.pdf |
Download |
Appendix C2-Dango bridge - GA.pdf |
Download |
Appendix C3-BEDLANE BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix C4-DANGO BRIDGE PROPOSED STRUCTURAL SOLUTIONS.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Freshwater Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix E-Public Participation Process Documents |
|
MD1668_D01_P393 BID.pdf |
Download |
Appendix F-EMPr |
|
MD1668_R0906_D01_P393_EMPr.pdf |
Download |
Appendix A |
|
P50-1 Pre-app Meeting.pdf |
Download |
Appendix B |
|
MD1730_R01_D04_P50-1 EMPr.pdf |
Download |
Appendix BA |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix BB |
|
MD1730_R001_F01_P50-1_SWMP_31-03-2017.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
Appendix C1.1 |
|
1. Final Freshwater Report.pdf |
Download |
Appendix C1.2 |
|
2. Freshwater Annexures.pdf |
Download |
Appendix C2 |
|
EP280-02_Eco-Pulse_P50 Road Upgrade_Terrestrial Habitat Impact Assessment Report_RHDHV_Rev2_22-05-17.pdf |
Download |
Appendix C3 |
|
P 50-1_Eshowe_Royal Haskoning_May 2017.pdf |
Download |
Appendix C4 |
|
Detailed Design Report.pdf |
Download |
Appendix D |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E |
|
1. P50-1 PPP Summary Report.pdf |
Download |
Appendix F |
|
1. P50-1LocalityMap.jpg |
Download |
2. P50-1 LN3 Map.jpg |
Download |
3. P50-1SensitivityMap.jpg |
Download |
Appendix G |
|
PHOTOS.pdf |
Download |
Appendix H |
|
2017-08-21 - Independent Peer Review Letter P 50-1 Rev 1 RK.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
A Joined.pdf |
Download |
Appendix B - EMPr |
|
Appendix BA |
|
EAP CVs Joined.pdf |
Download |
Appendix BB |
|
P449_Stormwater Management Plan_Signed.pdf |
Download |
Appendix BC |
|
Spill Contingency Plan.pdf |
Download |
MD1687_R01_D05_P449 EMPr.pdf |
Download |
Appendix C - Specialist Studies |
|
EP265-01 Eco-Pulse_P449 Culvert Upgrade_Freshwater Report_V0.1_30-11-2016.pdf |
Download |
P449-Culvert-Report-KM-0-to-KM-6-Rev02-signed.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs Joined.pdf |
Download |
Appendix E - PPP Summary |
|
1. P449 PPP Summary Report.pdf |
Download |
Appendix F - Maps and Drawings |
|
1. Locality Mao.jpg |
Download |
2. LN3 Map.jpg |
Download |
3. Sensitivity Map.jpg |
Download |
4. Sens Map_Culvert 1.jpg |
Download |
5. Sens Map_Culverts 2 and 3.jpg |
Download |
6. Culvert Design Drawings.pdf |
Download |
Appendix G - Photos |
|
Photos.pdf |
Download |
Appendix H - Peer review letter |
|
1. 2017-08-02 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
2. EP265_Response to queries raised by external reviewer_July 2017.pdf |
Download |
Appendix A - Pre-application Meeting Record |
|
1. IQ.pdf |
Download |
2. EDTEA Response.pdf |
Download |
3. Pre-app PPT.pdf |
Download |
Appendix B - EMPr |
|
EAP CVs and KG Profile.pdf |
Download |
MD1729_R01_D04_P230 EMPr.pdf |
Download |
Spill Contingency Plan.pdf |
Download |
Stormwater Management Plan Culvert Replacements.pdf |
Download |
Appendix C - Specialist Studies |
|
EP230 Culvert Upgrade_Freshwater Report_V1.pdf |
Download |
Appendix D - EAP CVs |
|
EAP CVs and KG Profile.pdf |
Download |
Appendix E - PPP Summary |
|
1. P230 PPP Summary Report.ver1.pdf |
Download |
Appendix F - Maps and Drawings |
|
Photos.pdf |
Download |
Appendix G - Photos |
|
1.Locality Map.jpg |
Download |
2.ListingNotice3Map.jpg |
Download |
3.SensitivityMap.jpg |
Download |
4. Culvert General Arrangement Drawing.pdf |
Download |
Appendix H - Peer review letter |
|
2017-06-26 - P230 Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Appendix A - Minutes of Pre-Application Meeting |
|
Attendance Register for Mboza Pre App.pdf |
Download |
MD1676_D01_Minutes of Pre App Meeting 07 June 2017.pdf |
Download |
Pre-Application Meeting Presentation Mboza.pdf |
Download |
Appendix B - EMPr |
|
B1 - EAP CV and KG Profile |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
SAS RHDHV Mboza WMMRP 27112015.pdf |
Download |
VV Certified_honours.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
B2 - Wetland Rehabilitation Plan |
|
Annexure A-Bridge Longitutinal Section.pdf |
Download |
Annexure B-Bridge Protection Works.pdf |
Download |
B3 - Stormwater Management Plan |
|
2-Storm Water Management Plan to Environmentalist Rev2.pdf |
Download |
B4 - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
B5 - Construction Method Statements |
|
MD1676_CMS final.pdf |
Download |
MD1676_R_F01_Mboza EMPr final_27 June 2017.pdf |
Download |
Appendix C - Specialist Studies |
|
C1 - Ecological Assessment |
|
Mboza Bridge Preliminary Survey (Dec 2015).pdf |
Download |
C2 - Aquatic and Wetland Assessment |
|
SAS RHDHV Mboza Bridge Aquatic and Wetland.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage_Phongola Bridge November 2015.pdf |
Download |
C4 - Social Assessment |
|
Peer Reviewed Social Impact Assessment 18.05.2016.pdf |
Download |
RHDHV Social Basic Assessment Report -Final.pdf |
Download |
C5 - Prelim Investigations Report |
|
Prelim Investigation Report.pdf |
Download |
C6 - Hydrology |
|
1-Hydralogy to Environmentalist Rev2.pdf |
Download |
2-Annexure A1-Pongola full Catchment.png |
Download |
3- Annexure A2-Mboza_Catchment_Plan_Downstream.pdf |
Download |
4- Annexure B1-Flows from Dwaf.pdf |
Download |
5-Annexure B2 Mboza Flows downstream of Jozini Dam.PDF |
Download |
6-Annexure C1-Voided deck hec ras section Bridge Only.pdf |
Download |
8-Annexure C3-Voided deck hec ras section.pdf |
Download |
C7 - Geotechnical |
|
Report_July 2013.pdf |
Download |
Appendix D - Company Profile & CVs of the EAP |
|
7. KG Profile.pdf |
Download |
B Griffiths - MSc + SACNASP - authorised copies.pdf |
Download |
Bronwen Griffiths_Curriculum Vitae_Feb 2017.pdf |
Download |
VV EAPSA certificate certified.pdf |
Download |
VV Honours.pdf |
Download |
Vorster V RHDHV Jan 2017.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
Comment from DAFF in Appendix A.pdf |
Download |
Comment from RDLF 2 in Appendix A.pdf |
Download |
Comment from RDLF in Appendix A.pdf |
Download |
MD1676_F01_Pongola (Mboza) River Bridge PPP Summary Report_27 June 2017.pdf |
Download |
Appendix F - Maps and Facility Illustration |
|
1 Revised Locality Map.jpg |
Download |
2 Sensitivity Map with LN3.jpg |
Download |
3 Sensitivity Map.jpg |
Download |
4 3513-01 Voded Deck GA for EIA Rev1-VOIDED DECK.pdf |
Download |
Appendix G - Photographs |
|
Photographs.pdf |
Download |
Appendix H - Other items |
|
Declaration_Ecological.pdf |
Download |
Heritage Declaration Frans Prins.pdf |
Download |
Mboza Independent Peer Review Letter Rev 1 RK.pdf |
Download |
SAS RHDHV signed declaration form 290517.pdf |
Download |
Specialist Declaration Form Social.pdf |
Download |
Appendix A-Locality Maps |
|
Appendix A1-Locality Map 1.jpg |
Download |
Appendix A2-Locality Map 2.pdf |
Download |
Appendix A3-Nkandla sensitivity.jpg |
Download |
Appendix B-Photos |
|
Appendix B-Site Photographs.pdf |
Download |
Appendix C-Facility Illustration |
|
Appendix C1-Stormwater Alternative 1.pdf |
Download |
Appendix C2-Stormwater Alternative 2.pdf |
Download |
Appendix C3-Sewer Altenative 1.JPG |
Download |
Appendix C4-Sewer Alternative 2.pdf |
Download |
Appendix C5-Roads Layout.pdf |
Download |
Appendix D-Specialist Studies |
|
Appendix D1-Ecological Report.pdf |
Download |
Appendix D2-Heritage Report.pdf |
Download |
Appendix D3-Engineering Services.pdf |
Download |
Appendix F-EMPr |
|
Appendix F-EMPr.pdf |
Download |
Appendix A - EDTEA Correspondence |
|
App A.pdf |
Download |
Appendix B - EMPr |
|
1 - EMPr |
|
MD1275_aEMPr_D03_Tinley South Draft.pdf |
Download |
MD1275_aEMPr_F02_Tinley South EMPr Final.pdf |
Download |
B1 - THD Standard Operating Procedures |
|
THD SOPs.pdf |
Download |
B2 - Stormwater Management Plan |
|
DH0014 - Stormwater Mangement Plan-Rev 3.pdf |
Download |
B3 - Soil Management Framework Strategy |
|
SFMS March 17.pdf |
Download |
B4 - Wetland and Open Space Rehabilitation Plan |
|
1. TMSB Wet and OS Rehab Plan May 2017.pdf |
Download |
Appendix A.pdf |
Download |
Appendix B1.pdf |
Download |
Appendix B2.pdf |
Download |
Tinley Wet & OS Rehab Plan March 17.pdf |
Download |
B5 - Traffic Management Plan |
|
108498_TinleyManor Southbanks_Traffic Management Plan.pdf |
Download |
B6 - Approved Wetland Crossings, Phasing Plans and Sensitivity Maps |
|
1 - Wetland Crossing Plans.pdf |
Download |
2 - Phasing Plans.pdf |
Download |
3.1 - Sensitivity Map.jpg |
Download |
3.1 Consolidated Sensitivity Map.jpg |
Download |
3.2 - No go Map.jpg |
Download |
Appendix C - Specialist Studies |
|
1. Response letter to EDTEA.pdf |
Download |
1. Veg Assessment.pdf |
Download |
2. Appendices.pdf |
Download |
2. Revised dev scheme letter.pdf |
Download |
3. Addendum 1.pdf |
Download |
3. Tinley manor TIA Rev 3.pdf |
Download |
4. Addendum 2.pdf |
Download |
4. Tech Note 1 - Analysis of construction traffic.pdf |
Download |
5. Tech Note 2 - DoT Corresp.pdf |
Download |
6. Tech Note 3 - Phasing Plan.pdf |
Download |
C1 - Agricultural Potential Assessment |
|
Agric Potential.pdf |
Download |
C10 - Urban Planning Report |
|
20170314_rev6_ Tinley Manor Report SDP.pdf |
Download |
20170519_Tinley Manor Report SDP.pdf |
Download |
C11 - Engineering Services Report |
|
1. Eng Services Report.pdf |
Download |
Engineering Services Report.pdf |
Download |
C12 - Electrical Services Report |
|
001 - Electrical Services Report rev 5.pdf |
Download |
C13 - Visual Assessment |
|
Tinley Manor South Banks VIA rev4 21 Feb 2017 AG.pdf |
Download |
C2 - Geotechnical Assessment |
|
0. Geotech Report.pdf |
Download |
23312 - Appendix A - EXP's 1 - 25.pdf |
Download |
23312 - Appendix A - IP's 1 - 49.pdf |
Download |
23312 - Appendix A - IP's 50 - 98.pdf |
Download |
23312 - Appendix B - DCP's 1 - 92.pdf |
Download |
23312 - Appendix C - Lab Results.pdf |
Download |
CAD 23312_1ATINLEY MANOR.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage.pdf |
Download |
C5 - Wetland Assessment |
|
Wet Assessment May 17.pdf |
Download |
C6 - Estuarine Assessment |
|
1. Estuary Assessment.pdf |
Download |
Mhlali_EstImpact Report_updated_v2.pdf |
Download |
Peer Review Umhlali Estuary.pdf |
Download |
C7.1 - Coastal Assessment |
|
Coastal Assessment May 17.pdf |
Download |
Tinley Manor Southbanks Coastal Assessment.pdf |
Download |
C7.2 - Beach Access Report |
|
Coastal_beaches Access.pdf |
Download |
ORI Data Report 2008_DRAFT_280708.pdf |
Download |
C7.3 - Coastal Feasibility Study |
|
Coastal Feasibility Report.pdf |
Download |
Final Report for THD setback line phase 2.pdf |
Download |
C7.4 - Coastal Addendums |
|
Addendum 1.pdf |
Download |
Addendum 2.pdf |
Download |
Addendum 2a.pdf |
Download |
C7.5 - Coastal Assessment Peer-review |
|
Coastal Peer-review.pdf |
Download |
C8 - Socio-economic Study |
|
1 .Cover Letter.pdf |
Download |
2. SIA.pdf |
Download |
C9 - Traffic Impact Assessment |
|
3. Tinley manor TIA Rev 4.pdf |
Download |
Appendix D - Details of EAP |
|
1 - Environmental Management & Compliance Profile - 2013.pdf |
Download |
2 - Strategic Enviro Planning Assessment Profile 2014.pdf |
Download |
3 - EAP CVs.pdf |
Download |
Appendix E - Similar Activities |
|
Tinley 2010vs2014 EIA Regulations.ver4.pdf |
Download |
Tinley 2010vs2014vs2017 EIA Regulations.ver6.pdf |
Download |
Appendix F - Layout Plans |
|
1 - Concept Plan.pdf |
Download |
10 - Typical Details.pdf |
Download |
11 - Sensitivity Map.jpg |
Download |
11.1 - Sensitivity Map.jpg |
Download |
11.2 - No go Map.jpg |
Download |
12 - No Go Areas.jpg |
Download |
2 - Phasing Plans.pdf |
Download |
3 - Bulk Water.pdf |
Download |
4 - Bulk Sewer.pdf |
Download |
5 - Construction Access.pdf |
Download |
6 - Road Layout.pdf |
Download |
7 - Bulk Irrigation.pdf |
Download |
8 - Stormwater Layout.pdf |
Download |
9 - Wetland Crossing Plans.pdf |
Download |
Appendix G - Service Level Agreements |
|
SLAs.pdf |
Download |
Appendix H - Public Participation Summary Report |
|
1 - PPP Summary Report.pdf |
Download |
2 - Issues Trail.pdf |
Download |
2 - Issues Trail.pdf |
Download |
3 - Comments Received.pdf |
Download |
Appendix A - Minutes of Pre-application Meeting |
|
R102-Pre-app.pdf |
Download |
Appendix B - Environmental Management Programme |
|
1. EMPr |
|
R102 EMPr_Jan 2016.pdf |
Download |
A - EAP CV and Knowledge Group Profile |
|
1. HB CV.pdf |
Download |
2. HB Qualifications.pdf |
Download |
3. HB PrSciNat.pdf |
Download |
4. PR CV.pdf |
Download |
5. PR Qualifications.pdf |
Download |
6. PR PriSciNat.pdf |
Download |
7. KG Profile.pdf |
Download |
B - Wetland Rehabilitation Plan |
|
Wet Rehab Plan.pdf |
Download |
C - Stormwater Management Plan |
|
Stormwater Management Plan.pdf |
Download |
D - Spill Contingency Plan |
|
Spill Contingency Plan.pdf |
Download |
Appendix C |
|
C1 - Wetland Assessment |
|
Wetland.pdf |
Download |
C2 - Vegetation Assessment |
|
Vegetation.pdf |
Download |
C3 - Heritage Assessment |
|
Heritage.pdf |
Download |
C4 - Nocturnal Survey |
|
Nocturnal.pdf |
Download |
C5 - Geotech Assessment |
|
Geotech.pdf |
Download |
C6 - Design Report |
|
Design Report.pdf |
Download |
Appendix D - EAP CV & Knowledge Group Profile |
|
1. HB CV.pdf |
Download |
2. HB Qualifications.pdf |
Download |
3. HB PrSciNat.pdf |
Download |
4. PR CV.pdf |
Download |
5. PR Qualifications.pdf |
Download |
6. PR PriSciNat.pdf |
Download |
7. KG Profile.pdf |
Download |
Appendix E - Public Participation Summary Report |
|
R102 PPP Summary Report_Jan 2017.pdf |
Download |
Appendix F - Map and Facility Illustrations |
|
1. Locality Map.jpg |
Download |
2. Listing Notice 3 Map-Consolidated.jpg |
Download |
3. Listing Notice 3 Map _A.jpg |
Download |
4. Listing Notice 3 Map_C.jpg |
Download |
5. Sensitivity Map_Consoliated.jpg |
Download |
6. Sensitivity Map_A.jpg |
Download |
7. Sensitivity Map_C.jpg |
Download |
8. A_General Arrangement Drawing.pdf |
Download |
9. Road Layout.pdf |
Download |
Thumbs.db |
Download |
Appendix G - Photographs |
|
Photos.pdf |
Download |
Thumbs.db |
Download |
Appendix H |
|
1. Peer-review Letter |
|
2016-07-06 - Independent Peer Review Letter Rev 1 RK.pdf |
Download |
Cover Letter Peer review response.pdf |
Download |
2. Specialist Declaration Forms |
|
R102 Heritage Declaration.pdf |
Download |
R102 Specialist Declaration_Tarrant_Dec 2015.pdf |
Download |
R102 Specialist Declaration_Template_EcoPulse Freshwater.pdf |
Download |
R102 Specialist Declaration_Template_EcoPulse Terrestrial.pdf |
Download |
INTEGRATED ENVIRONMENTAL AUTHORISATION AND WASTE MANAGEMENT LICENCE (ENVIRONMENTAL IMPACT REPORTING PROCESS) FOR THE PROPOSED SOLAFRICA SAND DRAAI CSP PLANTS WITHIN THE !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE
View period till end of February 2017
Documents |
|
SandDraai Solafrica CR Environmental Authorisation |
Download |
SandDraai Solafrica PT Environmental Authorisation |
Download |
NOTICE OF ENVIRONMENTAL AUTHORISATION: BASIC ASSESSMENT FOR THE PROPOSED SIBAYA BULK WATERLINE FROM THE WATERLOO RESERVOIR TO THE SIBAYA PRECINCT IN THE ETHEKWINI METROPOLITAN MUNICIPALITY - EDTEA REF NO: DM/0010/2016
Notice is hereby given in terms of the Environmental Impact Assessment Regulations (2014) published in Government Notice No. R985, in terms of Section 10(2) of the National Environmental Management Act (Act No 107 of 1998), of the Environmental Authorisation (EA) by the Department of Economic Development, Tourism and Environmental Affairs (EDTEA) received on 25th October 2016 to authorise the initiative by Tongaat Hulett Developments to construct a 700 mm water pipeline linking the Waterloo Reservoir to the Sibaya Precinct within the eThekwini Metropolitan Municipality in KwaZulu-Natal.
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from (a) The date that the notification of the decision for an application for an EA was sent to the registered Interested and Affected Parties (I&APs) by the applicant.
NOTICE OF WASTE MANAGEMENT LICENCE: ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE CHARLIE 1 LANDFILL OPTIMISATION AND STORMWATER MANAGEMENT PROJECT, SASOL SYNFUELS, SECUNDA, MPUMALANGA (DEA REF: 12/9/11/L49416/6)
Documents |
|
WML Notification to I&APs_Charlie 1 |
Download |
LICENCE FOR CHARLIE 1 SASOL SA |
Download |
NOTICE OF INTEGRATED ENVIRONMENTAL AUTHORISATION (IEA) FOR THE PROPOSED CONTINUOUS ASH DISPOSAL FACILITY FOR THE MATIMBA POWER STATION IN LEPHALALE, LIMPOPO (DEA REF: 14/12/16/3/3/3/56, NEAS REF: DEA/EIA0001442/2012)
The Department of Environmental Affairs (DEA) has issued an Integrated Environmental Authorisation (IEA) to Eskom Holdings SOC Ltd (Eskom), in respect of the aforementioned project in terms of the National Environmental Management Act, 1998 (No 107 of 1998) (as amended) and the Environmental Impact Assessment (EIA) Regulations, 2010 and the National Environmental Management: Waste Act, 2008 (No 59 of 2008) (as amended) and Government Notice 921 of 2013. The IEA was issued on 14 July 2016.
In terms of Regulation 60(1) of the EIA Regulations (2010), any person wishing to appeal the granting of this IEA must lodge a notice of intention to appeal with the Minister, within 20 days after the date of the decision i.e. on or before 03 August 2016. I&APs intending to submit a Notice of Intention to Appeal should send a copy to the Applicant and Royal HaskoningDHV as well as a notice indicating where and for what period the appeal submission will be available for inspection by the applicant within 10 days of lodging the notice. An appeal must be submitted to the Minister within 30 days after the lapsing of the 20 days contemplated in Regulation 60(1).
EIA FOR THE CONSTRUCTION OF A CSP PLANT BASED ON CENTRAL RECEIVER TECHNOLOGY ON THE FARM SAND DRAAI, NORTHERN CAPE.
Available for Public Review
Section 24M(3) Exemption Motivation Report for the Continuous Ash Disposal at Matimba Power Station, Lephalale, Limpopo Province.
Commenting period: 18 May – 20 June 2016
Documents |
|
Exemption Motivation Report for the Continuous Ash Disposal at Matimba Power Station |
Download |
Appendix A - Applicant Declaration |
Download |
NOTICE OF AMENDED ENVIRONMENTAL AUTHORISATION: CORNUBIA PHASE 2 MIXED-USE PHASED DEVELOPMENT - EDTEA REF NO: DM/AMEND/0030/2015
Notice is hereby given in terms of the Environmental Impact Assessment Regulations (2014) published in Government Notice No. R985, in terms of Section 10(2) of the National Environmental Management Act (Act No 107 of 1998), of the Amended Environmental Authorisation (EA) by the Department of Economic Development, Tourism and Environmental Affairs (EDTEA) received on 29th April 2016 to amend the EA for the Cornubia Mixed-Use Phased Development, Phase 2 in KwaZulu-Natal.
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from (a) The date that the notification of the decision for an application for an EA was sent to the registered Interested and Affected Parties (I&APs) by the applicant.
Documents |
|
CORNUBIA PHASE 2 MIXED-USE PHASED DEVELOPMENT |
Download |
Consultation Basic Assessment Report for the Proposed Sibaya Bulk Waterline from the Waterloo Reservoir to the Sibaya Precinct in eThekwini Metropolitan Municipality, KwaZulu-Natal.
Tongaat Hulett Developments propose constructing the Sibaya Bulk Waterline within the eThekwini Metropolitan Municipality in KwaZulu-Natal. A 700 mm water pipeline linking the Waterloo Reservoir to the Sibaya Precinct is proposed in order to ensure water supply to the Node 1 & 5 Sibaya Precinct Development which is scheduled to commence with construction in 2016.
Tongaat Hulett Developments has appointed Royal HaskoningDHV to act as the independent Environmental Assessment Practitioner (EAP) for the Basic Assessment study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2014), the draft Consultation Basic Assessment Report and associated documents have been made available for public review and comment for a period of 30 calendar days from 22 April 2016 to 26 May 2016.
Client: Tongaat Hulett Developments
Documents |
Central Reciever |
W01 RDC 000052_Sibaya Waterline BA_April 2016 |
Download |
APPENDIX A: Minutes of Pre-application Meeting |
|
1. Sibaya Pre-app Meeting Minutes 18.03.2016 |
Download |
2. Sibaya Waterline Pre-Application Meeting Presentation.pdf |
Download |
APPENDIX B: Environmental Management Programme |
|
W01 RDC 000052_Sibaya Waterline BA_April 2016 |
Download |
APPENDIX B 1: EAP CV & Knowledge Group Profile |
|
1. HB CV |
Download |
2. HB Qualifications |
Download |
3. HB PrSciNat |
Download |
4. PR CV |
Download |
5. PR Qualifications |
Download |
6. PR PriSciNat |
Download |
7. KG Profile |
Download |
APPENDIX B 2: THD Standard Operating Procedures |
|
THD SOPs |
Download |
APPENDIX B 3: Wetland and Open Space Rehabilitation Plan |
|
Sibaya Nodes 1-5 - Final Wetland Rehabilitation & Management Plan Rev 2 October 2015 |
Download |
APPENDIX B 4: Stormwater Management Plan |
|
Sibaya Precinct(Nodes 1&5) Stormwater Management Plan REV B.pdf |
Download |
APPENDIX C 1: Wetland Assessment |
|
1. Sibaya Nodes 1-5 - Final Wetland Functionality Assessment Rev 2 October 2015 |
Download |
2. Sibaya_Wet-ECOSERVICES Report |
Download |
APPENDIX C 2: Vegetation Assessment |
|
1. 2016-04-05 - Email Version Combined Vegetation Assessment Compressed Rev 1 RK |
Download |
2. Draft Ecological Assessment Rev 1RK_Full |
Download |
3. Ecological Sibaya Node 4.pdf |
Download |
APPENDIX C 3: Heritage Assessment |
|
sibaya 700mm water pipeline hia |
Download |
APPENDIX C 4: Geotechnical Assessment |
|
Geotechnical Investigation Report for the Sibaya Bulk Services Project |
Download |
Appendix C 5: Engineering Services Report |
|
Sibaya Bulk Water Project Description Report |
Download |
APPENDIX D: EAP CV & Knowledge Group Profile |
|
1. HB CV |
Download |
2. HB Qualifications |
Download |
3. HB PrSciNat |
Download |
4. PR CV |
Download |
5. PR Qualifications |
Download |
6. PR PriSciNat |
Download |
7. KG Profile |
Download |
APPENDIX E: Public Participation Summary Report |
|
1. Sibaya Waterline PPP Summary Report.ver1.pdf |
Download |
APPENDIX F: Map & Facility Illustrations |
|
1. Locality Map_BA |
Download |
2. Listing Notice 3 BA |
Download |
3. Sensitivity Map BA |
Download |
4. Preferred Pipeline Alignment |
Download |
5. Alternative Pipeline Alignment |
Download |
APPENDIX G: Photographs |
|
Photos |
Download |
APPENDIX H: Other Items |
|
Sibaya Waterline BA Letter of Financial Provision |
Download |
Municipal Solid Waste Beneficiation Opportunities at the NMBM_Feasibility Report
Available for Public Review until 25th of May 2016.
Documents |
|
NMBMM Feasibility Study_30 Nov 2014_FINAL |
Download |
Notice of Environmental Authorisation: Emergency Nondabula Water Reticulation Project Basic Assessment (REF: DC29/0006/2015).
Notice is hereby given in terms of the Environmental Impact Assessment Regulations (2014) published in Government Notice No. R985, in terms of Section 10(2) of the National Environmental Management Act (Act No 107 of 1998), of the Environmental Authorisation (EA) by the KwaZulu-Natal Department Economic Development, Tourism and Environmental Affairs (KZN EDTEA) received on 18th March 2016 to authorise the initiative by the iLembe District Municipality to construct the Emergency Nondabula Water Reticulation project in the Ndwedwe Local Municipality in KwaZulu-Natal.
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from (a) The date that the notification of the decision for an application for an EA was sent to the registered Interested and Affected Parties (I&APs) by the applicant i.e. 28 March 2016.
Documents |
|
Environmental Authorisation - Emergency Nondabula REF DC29_0006_2015 |
Download |
EIA FOR THE CONSTRUCTION OF A CSP PLANT BASED ON CENTRAL RECEIVER TECHNOLOGY ON THE FARM SAND DRAAI, NORTHERN CAPE.
Available for Public Review: 14 March to 15 April 2016
NOTICE OF ENVIRONMENTAL AUTHORISATION: CONSTRUCTION OF THE BHUDLU ACCESS BRIDGE AND LINK ROAD - DEA REF NO: 14/2/16/3/3/1/1487.
Notice is hereby given in terms of the Environmental Impact Assessment Regulations (2014) published in Government Notice No. R985, in terms of Section 10(2) of the National Environmental Management Act (Act No 107 of 1998), of the Environmental Authorisation (EA) by the Department of Environmental Affairs (DEA) received on 2nd March 2016 to authorise the initiative by the uMuziwabantu Local Municipality to construct the Bhudlu Access Bridge and Link Road in the uMuziwabantu Local Municipality in KwaZulu-Natal and the Mbizana Local Municipality in the Eastern Cape.
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from (a) The date that the notification of the decision for an application for an EA was sent to the registered Interested and Affected Parties (I&APs) by the applicant.
Documents |
|
14.12.16.3.3.1.1487_EA |
Download |
Scoping Report for Health Care Risk Waste Incinerator.
Available for Public Review: 19 February 2016 -19 March 2016
Notice is hereby given in terms of the Environmental Impact Assessment Regulations published in Government Notice No.R543 to No.R545 of 2010, in terms of Section 24 (5) of the National Environmental Management Act (Act No 107 of 1998), of the initiative by Tongaat Hullet Developments, (Pty) Ltd, to develop the Canelands Extension, eThekwini Municipality, KwaZulu-Natal Province.
In respect of the above, the applicant, Tongaat Hullet Developments, (Pty) Ltd intends to submit a Basic Assessment Report as contemplated in the Regulations to the KwaZulu-Natal Department of Economic Development, Tourism and Environmental Affairs (KZN EDTEA) as well as a water use licence application in terms of Section 21 of the National Water Act (Act No 36 of 1998) to the Department of Water and Sanitation (DWS).
As part of the public participation process, you are invited to review the draft Basic Assessment Report and make comment on the document. The Basic Assessment Report will be available for review at the following public places:
• The Canelands Public Library, 1 Alec Bean Road, Canelands, Verulam, 4339; and
• Royal HaskoningDHV website: www.rhdhv.co.za
Please note: The comment period is from 18 February to 26 April 2016.
Documents |
|
1. Cover Letter dBAR - EDTEA |
Download |
2. Cover Letter_dBAR_General |
Download |
3. The Canelands Extension Basic Assessment Report V5 |
Download |
APPENDIX A: Site plan(s) and Maps |
|
Locality Map |
Download |
APPENDIX B: Site Photographs in 8 compass points |
|
Site Photos |
Download |
APPENDIX C: Facility illustration(s) |
|
Facility Illustrations and Layouts |
Download |
APPENDIX D: Specialists Reports |
|
D1 – Engineering Services Report |
Download |
D2 – Vegetation report |
Download |
D3a - Freshwater Plant Species List 2014 |
Download |
D3a – Wetland Delineation and Rehabilitation Plan (2012) |
Download |
D3b – Updated Wetland Functionality Assessment and Rehabilitation Plan (2015) |
Download |
D3c – Aquatic Assessment (2015) |
Download |
D4 –- Heritage Impact Assessment |
Download |
D5 – Geotechnical Investigation |
Download |
D6 – Traffic Impact Assessment |
Download |
D7 – Major Hazardous Installation Risk Assessment (THD commissioned and SASOL commissioned) |
Download |
D8 – Stormwater Management Plan |
Download |
D9 - Copies of Specialist Declarations and Ecological Validity |
Download |
APPENDIX E: Public Participation Process (PPP) |
|
E1 – PPP Summary |
Download |
E2 – Background Information Document (BID) |
Download |
E3 – Site Notices |
Download |
E4 – Advertisement |
Download |
E5 – I&AP Database |
Download |
E6 – Comments and Response Report (Issues Trail) |
Download |
E7 – Comments Received |
|
Appendix F: Draft Environmental Management Programme (EMPr) |
|
Canelands EMPr Appendices |
Download |
Canelands Extension EMPr V4 |
Download |
Appendix G: Other information |
|
G1 – Water Use Licence Application Pre-Application Meeting Documents |
Download |
G2 – Curriculum Vitae of EAP |
Download |
G3 – Climate Resilience Framework Deliverables |
Download |
NOTICE OF ENVIRONMENTAL AUTHORISATION: BASIC ASSESSMENT FOR THE DISMANTLING OF A PORTION OF THE EXISTING DOUBLE-CIRCUIT POWER LINE AND THE CONSTRUCTION OF TWO (2) 7 KM LONG 88 kV POWER LINES WITHIN A 2 KM CORRIDOR BETWEEN GROOTPAN AND BRAKFONTEIN NEAR OGIES, MPUMALANGA PROVINCE.
(DEA REF: 14/12/16/3/3/1/1448).
In terms of Regulation 4(1) of the National Appeal Regulations, 2014 (GN R.993), an appellant must submit the appeal to the appeal administrator, and a copy of the appeal to the applicant, any registered Interested and Affected Party (I&AP) and any Organ of State with interest in the matter within 20 days from:
(a) The date that the notification of the decision for an application for an environmental authorisation or a waste management licence was sent to the registered Interested and Affected Parties (I&APs) by the applicant (i.e. 29 January 2016).
BACKGROUND INFORMATION DOCUMENT FOR THE APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF NEMA FOR THE UNLAWFUL COMMENCEMENT AND / OR CONTINUATION OF LISTED ACTIVITIES ON THE FARM EKANGALA 610JR, GAUTENG.
Available for Public Review: 18 January 2016 – 18 March 2016
Documents |
|
BID CoT S24G Rectification January 2016_Final |
Download |
Western Cape Province Coastal Management Programme (CMP) 2015.
Available for Public Review: 11 January 2016 – 15 February 2016
ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE CHARLIE 1 LANDFILL OPTIMISATION AND STORMWATER MANAGEMENT PROJECT, SASOL SYNFUELS, SECUNDA, MPUMALANGA.
Available for Public Review: 11 December 2015 – 01 February 2016
PROPOSED SOLIDS REMOVAL AND TREATMENT FACILITIES UPGRADE AT
SOUTHERN WASTE WATER TREATMENT WORKS, MEREWENT,
IN ETHEKWINI METROPOLITAN MUNICIPALITY
EDTEA REF NO: DM/0032/2014
WASTE MANAGEMENT REFERENCE NO: DM/WML/0050/2014
WUL REFERENCE NO: 11/U60G/H/1623
CWDP REFERENCE NO: To be confirmed
DWA EXEMPTION NO: 1747B
Classified as a Major Hazardous Installation
Notice is hereby given in terms of the Environmental Impact Assessment (EIA) Regulations (2010) published in Government Notice No.R543 to No.R545, in terms of Section 24 (5) of the National Environmental Management Act (Act No 107 of 1998) (as amended), the National Environmental Management Waste Act (Act No 59 of 2008), the National Environmental Management: Integrated Coastal Management Act (Act No 44 of 2008) and the National Water Act (Act 36 No of 1998) of the initiative by the eThekwini Municipality, Water and Sanitation Department, to undertake the Solids Removal and Treatment Facilities Upgrades at the Southern Waste water Treatment Works (SWWTW) in Merewent, KwaZulu-Natal Province.
In respect of the above, the applicant, eThekwini Municipality is undertaking the general EIA and Waste Management License (WML) processes. The Scoping phase was carried out in 2014, with approval of the resultant Scoping Report and plan for the next phase of the process, being obtained in December 2014. This process is as contemplated in the EIA Regulations for the process of applying for authorisation for the above proposed development to the Competent Authority, the KwaZulu-Natal Department of Economic Development, Tourism & Environmental Affairs (KZN edtea), as well as a WML application in terms of Section 19(2) of the National Environmental Management: Waste Act (Act No 59 of 2008).
As part of the public participation process, you are invited to review the FINAL EIA Report and make comment on the document. This report will only be available electronically for review at the following website: Royal HaskoningDHV website: www.rhdhv.co.za
Client: eThekwini Municipality via AECOM
Applicant: eThekwini Municipality
Comment Period: 09 to 30 November 2015
Documents |
|
08.11.2015 fEIAR SWWTW SRTFU V2.pdf |
Download |
Appendix A: AUTHORITY CORRESPONDENCE & EXISTING PERMITS |
|
A1 – CLARIFICATION FROM DEA |
Download |
A2 – CLARIFICATION FROM (THE THEN) DAEA |
Download |
A3 – PERMISSION FROM (THE THEN) DAEA TO UPSCALE |
Download |
A4 – ACCEPTANCE OF APPLICATION AND ISSUE OF REFERENCE NUMBERS |
Download |
A5 – ACCEPTANCE OF ENVIRONMENTAL SCOPING REPORT AND PLAN OF STUDY |
Download |
A6 – EXISTING WATER USE LICENCE |
Download |
Appendix B: PUBLIC PARTICIPATION REPORT |
|
B1 – PUBLIC PARTICIPATION SUMMARY |
Download |
B2 – SCOPING AND EIA PHASE ADVERTISEMENTS |
Download |
B3 –SCOPING AND EIA PHASE SITE NOTICES |
Download |
B4 – SCOPING AND EIA PHASE BACKGROUND INFORMATION DOCUMENTS |
Download |
B5 – SCOPING AND EIA PHASE DISTRIBUTION LOGS |
Download |
B6 – SCOPING PHASE MEETINGS |
|
B6.1 – INTRODUCTORY MEETING |
Download |
B6.2 – FOCUS GROUP MEETING |
Download |
B6.3 – PUBLIC MEETING |
Download |
B7 – EIA PHASE MEETINGS |
|
B7.1 – SPECIALIST DISCUSSION (AD HOC) MEETING |
Download |
B7.2 – FOCUS GROUP MEETING |
Download |
B7.3 – PUBLIC MEETING |
Download |
B8 – PROJECT I&AP DATABASE |
Download |
B9 – ISSUES TRAIL |
Download |
B9.1 – SCOPING COMMENTS PART I |
Download |
B9.2 – SCOPING COMMENTS PART II |
Download |
B9.3 – EIA COMMENTS PART I |
Download |
B9.4 – EIA COMMENTS PART II |
Download |
Appendix C: SPECIALIST REPORTS |
|
C1 – BIODIVERSITY ASSESSMENT |
Download |
C2 – UPDATED MHI RISK ASSESSMENT |
Download |
C3 – UPDATED AIR QUALITY REPORT |
|
C3.1 UmoyaNilu Review of AQA.pdf |
Download |
C3.2 Endorsement of AQA.pdf |
Download |
C3.3 Response to Review of AQA.pdf |
Download |
C3.4 Amended AQA.pdf |
Download |
C3.5 Air Quality Passive Sampling Report.pdf |
Download |
C4 – HERITAGE IMPACT ASSESSMENT |
Download |
C5 – UPDATED PROCESS RISK ASSESSMENT – HAZID |
|
C5.1 Mr Chetty of DUT Review of HAZID.pdf |
Download |
C5.2 Mr Chetty of DUT Endorsement of HAZID.pdf |
Download |
C5.2 Mr Chetty of DUT Endorsement of IWWMP.pdf |
Download |
C5.3 Response to Review of HAZID.pdf |
Download |
C5.4 Amended HAZID.pdf |
Download |
C6 – UPDATED INTEGRATED WASTE AND WATER MANAGEMENT PLAN |
|
C6.1 Mr Chetty of DUT Review of IWWMP.pdf |
Download |
C6.2 Mr Chetty of DUT Endorsement of IWWMP.pdf |
Download |
C6.3 Response to Review of IWWMP.pdf |
Download |
C6.4 Amended IWWMP.pdf |
Download |
C6.5 IWWMP Appendices.pdf |
Download |
C7 – UPDATED SOCIAL IMPACT ASSESSMENT |
|
C7.1 Dr Scott of UKZN Review of SIA.pdf |
Download |
C7.2 Dr Scott of UKZN Endorsement of SIA.pdf |
Download |
C7.3 Response to Review of SIA.pdf |
Download |
C7.4 Amended SIA.pdf |
Download |
C8 – UPDATED TRAFFIC IMPACT STATEMENT |
|
C8.1 DMA Review of TIS.pdf |
Download |
C8.2 DMA Endorsement of TIS.pdf |
Download |
C8.3 Response to Review of TIS.pdf |
Download |
C8.4 Amended TIS.pdf |
Download |
C9 – GEOTECHNICAL REPORT |
Download |
C10 – SPECIALIST DECLARATIONS AND PEER REVIEW DECLARATIONS |
Download |
Appendix D: DRAWINGS |
|
SCOPE OF WORKS / LAYOUT PLAN |
Download |
TANKER BAY FACILITY DESIGN |
Download |
PROCESS FLOW DIAGRAM |
Download |
Appendix E |
|
UPDATED FINAL ENVIRONMENTAL MANAGEMENT PROGRAMME |
Download |
Appendix F: ADDITIONAL REPORTS / INFORMATION |
|
CSIR REPORTS |
Download |
PROOF OF SLUDGE DISPOSAL DESTINATION |
Download |
Appendix G: TEAM CURRICULUM VITAE |
|
CORE TEAM CURRICULUM VITAE |
Download |
SPECIALISTS CURRICULUM VITAE |
Download |
BASIC ASSESSMENT FOR THE PROPOSED BHUDLU ACCESS BRIDGE AND LINK ROAD
Notice is hereby given in terms of the Environmental Impact Assessment (EIA) Regulations (2014) published in Government Notice Regulation (GNR) 982 - GNR 985, in terms of Section 24 (5) of the National Environmental Management Act (NEMA) (Act No 107 of 1998) (as amended) and the National Water Act (NWA) (Act 36 No of 1998) of the initiative by the uMuziwabantu Local Municipality, to provide a formal access road and Bhudlu access bridge crossing the Umtamvuna River, to link the uMuziwabantu Local Municipality in KwaZulu-Natal and the Mbizana Local Municipality in Eastern Cape.
In respect of the above, the applicant, uMuziwabantu Local Municipality is undertaking a Basic Assessment process as contemplated in the EIA Regulations for the process of applying for authorisation for the above proposed development to the Competent Authority, the National Department of Environmental Affairs (DEA), as well as applying for Water Use Licence (WUL) to the Competent Authority, the National Department of Water and Sanitation as contemplated in Chapter 4 of the NWA
PUBLIC PARTICIPATION PROCESS
As part of the public participation process, you are invited to review the draft / consultation BA Report and make comment on the document. This report in hardcopy is also available for review at the Nhlangano Tribal Council.
Please note: The comment period is as follows:
23 October to 23 November 2015 (30 days) – NEMA
23 October to 30 December 2015 (60 days) – NWA
WHO SHOULD YOU CONTACT?
Royal HaskoningDHV, as an independent environmental assessment practitioner, has been assigned to undertake the required BA and WUL Application for the proposed project.
I&APs are invited to register by submitting their name, contact information and interest in the project to the Environmental consultant at the details below.
Andile Mnyandu
Royal HaskoningDHV
PO Box 55, Pinetown, 3600
Tel | 031 719 5531
Fax | 031 719 5505
E-mail | andile.mnyandu@rhdhv.com
Client: GM Turner and Associates via Umuziwabantu Local Municipality
Applicant: Umuziwabantu Local Municipality
Documents |
|
Cover Letter_BHUDLU_General |
Download |
Peer Review Changes letter 21.10.2015 |
Download |
Consultation Basic Assessment Report |
Download |
Appendix A |
|
2localitytopo |
Download |
3localityaerial_updated |
Download |
Bhudlu Bridge Access Layout |
Download |
Route 1 Options to Bhudlu Bridge |
Download |
Route 2 Options to Bhudlu Bridge |
Download |
Route 3 Options to Bhudlu Bridge |
Download |
4cbas |
Download |
Sensitivity Map_Overall |
Download |
Shapefiles |
Download |
250m coordinates |
Download |
Appendix B |
|
Photograph Collation |
Download |
Appendix C |
|
6 Cell Culvert alternative |
Download |
Bhudlu Bridge & Access_Layout Plan 1 |
Download |
Bhudlu Bridge & Access_Layout Plan 2 |
Download |
Bhudlu Bridge & Access_Layout Plan 3 |
Download |
CULVERT_BRIDGE_PROJECT 20_10_2015 |
Download |
Road Cross Section |
Download |
Typical XS ROADS_1-2 |
Download |
Appendix D |
|
Freshwater Habitat Impact Assessment |
Download |
Terms of Reference for the Freshwater Impact Assessment |
Download |
Biodiversity Impact Assessment |
Download |
Terms of Reference for the Biodiversity Impact Assessment |
Download |
Heritage Impact Assessment |
Download |
Terms of Reference for the Heritage Impact Assessment |
Download |
Design Report and Hydrological Report |
Download |
Geotechnical Assessment |
Download |
Materials Investigation |
Download |
Stormwater Management Plan |
Download |
Appendix E |
|
PPP Summary |
Download |
Proof of Advertisement |
Download |
Site notice photos |
Download |
Bhudlu BA Issues Trail V1 |
Download |
Notification to Authorities |
Download |
I&AP Database |
Download |
Meeting Correspondence |
Download |
Appendix F |
|
Detailed Impact Assessment final |
Download |
Appendix G |
|
EMPr |
Download |
Appendix H |
|
EAP Qualifications |
Download |
Environmentalist Qualifications |
Download |
Appendix I |
|
Copy of Specialist Declarations |
Download |
Letter of Financial Provision amended |
Download |
Appendix J |
|
PROOF OF SUBMISSION OF APPLICATION FORM |
Download |
Pre-app Record for Bhudlu Bridge and Access Road WULA |
Download |
Independent Peer Review Letter |
Download |
Signed Specialist Declaration |
Download |
BASIC ASSESSMENT FOR THE ESTABLISHMENT OF THE NTATSHANA ACCESS ROAD
Notice is hereby given in terms of the Environmental Impact Assessment (EIA) Regulations (2010) published in Government Notice No.R543 to No.R545, in terms of Section 24 (5) of the National Environmental Management Act (Act No 107 of 1998) (as amended), and the National Water Act (Act 36 No of 1998) of the initiative by the Umzumbe Local Municipality, to undertake the establishment of the Ntatshana Road and Bridge, Umthwalume, KwaZulu-Natal Province.
In respect of the above, the Final Basic Assessment Report is available here for comment for a period of 21 days.
Client: PGA Consulting via Umzumbe Local Municipality
Applicant: Umzumbe Local Municipality
Comment Period: 06 October 2015 – 26 October 2015
Documents |
|
FINAL CONSULTATION BAR |
|
Final Ntatshana Road BAR Draft 2 04.10.2015.pdf |
Download |
T01.DUR.000201 fBAR cover page.pdf |
Download |
APPENDIX A |
|
Appendix A2 Locality Map.pdf |
Download |
APPENDIX B |
|
Appendix B Photograph collation and 5oom coordinates.pdf |
Download |
APPENDIX C |
|
Appendix C1 Design Drawing for Facility Illustration.pdf |
Download |
Appendix C2 Geotech Site Plan for Facility Illustration.pdf |
Download |
Appendix C3 Geotech Mtwalume Bridge Plan for Facility Illustration.pdf |
Download |
APPENDIX D |
|
Appendix D1 Phase 1 HIA Report.pdf |
Download |
Appendix D2 Preliminary Ecological Survey.pdf |
Download |
Appendix D3.1 Design Report.pdf |
Download |
Appendix D3.2.pdf |
Download |
Appendix D3.3.pdf |
Download |
Appendix D3.4.pdf |
Download |
Appendix D3.5.pdf |
Download |
Appendix D4.1 Geotechnical Report.pdf |
Download |
Appendix D4.2.pdf |
Download |
Appendix D4.3.pdf |
Download |
Appendix D4.4.pdf |
Download |
Appendix D4.5.pdf |
Download |
Appendix D4.6.pdf |
Download |
Appendix D4.7.pdf |
Download |
Appendix D5 Aquatic Assessment.pdf |
Download |
Appendix D6 SMP.pdf |
Download |
APPENDIX E |
|
Appendix E1 PPP Summary Final.pdf |
Download |
Appendix E2 BIDs collated.pdf |
Download |
Appendix E3 Site notices collated.pdf |
Download |
Appendix E4 Adverts collated.pdf |
Download |
Appendix E5 Meetings collated.pdf |
Download |
Appendix E6 I&AP database.pdf |
Download |
Appendix E7 Ntatshana Rd Final Issues Trail ver 4 04.10.2015.pdf |
Download |
Appendix E8 Comments collated.pdf |
Download |
APPENDIX F |
|
Appendix F Ntatshana Rd Final EMPr ver.5 04.10.2015.pdf |
Download |
Appendix F2 CMS.pdf |
Download |
NOTICE OF INTEGRATED ENVIRONMENTAL AUTHORISATION FOR THE UNDERGROUND COAL GASIFICATION PROJECT AND ASSOCIATED INFRASTRUCTURE IN SUPPORT OF CO-FIRING OF GAS AT THE MAJUBA POWER STATION, AMERSFOORT, MPUMALANGA (DEA REF: 14/12/16/3/3/3/61, NEAS REF: DEA/EIA0001492/2012)
The Department of Environmental Affairs (DEA) has issued an Integrated Environmental Authorisation (IEA) to Eskom Holdings SOC Ltd (Eskom), in respect of the aforementioned project in terms of the National Environmental Management Act, 1998 (No 107 of 1998) (as amended) and the Environmental Impact Assessment (EIA) Regulations, 2010 and the National Environmental Management: Waste Act, 2008 (No 59 of 2008) (as amended) and Government Notice 921 of 2013. The IEA was issued on 24 August 2015.
In terms of Regulation 60(1) of the EIA Regulations (2010), any person wishing to appeal the granting of this EA must lodge a notice of intention to appeal with the Minister, within 20 days after the date of the decision i.e. 14 September 2015
Consultation Basic Assessment Report: in support of the Emergency Nondabula Water Reticulation Project
Notice is hereby given in terms of the Environmental Impact Assessment (EIA) Regulations Government Notice Regulation (GNR) No. 983 to 985 of 2014 (as amended), published in terms of Section 24(5), and read with Section 44, of the National Environmental Management Act (NEMA) (Act No. 107 of 1998), of the opportunity to comment on the consultation Basic Assessment Report (cBAR) for the above project.
Project Title: Basic Assessment for the Proposed Emergency Nondabula Water Reticulation Project, KwaZulu-Natal
Applicant: iLembe District Municipality
Comment Period: 21 August 2015 – 21 September 2015
Documents |
|
FINAL CONSULTATION BAR |
|
RHDHV - Emergency Nondabula cBAR_Final cBAR.pdf |
Download |
Cover Letter_Proposed Emergency Nondabula_EDTEA.pdf |
Download |
APPENDIX A: MAPS |
|
Layout Drawing entire area-A0-TS.pdf |
Download |
Sensitivity Map Overall_Revised Boundary.pdf |
Download |
Sensitivity Map Zoomed_Revised Boundary.pdf |
Download |
W01.DUR.000180-104_ReticulationLayout.pdf |
Download |
W01.DUR.000180-105_ExistingLayout.pdf |
Download |
APPENDIX B: SITE PHOTOGRAPHS |
|
Site Photographs.pdf |
Download |
APPENDIX C: FACILITY ILLUSTRATIONS |
|
W01.DUR.000180-104_ReticulationLayout.pdf |
Download |
APPENDIX D: SPECIALIST STUDIES |
|
Cover Letters |
|
Cover Letter_Eco_Change of Scope.pdf |
Download |
Cover Letter_Geohydro_Change of Scope.pdf |
Download |
Cover Letter_Heritage_Change of Scope.pdf |
Download |
Cover Letter_Wetland_Change of Scope.pdf |
Download |
Ecological |
|
Ecological Survey.pdf |
Download |
Geohydrological |
|
2015-04-10 Final Ozwathini Nhlangakazi Drilling Report.pdf |
Download |
Heritage |
|
Heritage study.pdf |
Download |
Peer Review_Kinvig & Associates |
|
Independent Peer Review Letter.pdf |
Download |
Peer Review Changes_RHDHV Letter_Final.pdf |
Download |
Wetlands |
|
SAS RHDHV Nondabula Water Reticulation Wetland Eco Ass 01072015.pdf |
Download |
APPENDIX E: PUBLIC PARTICIPATION |
|
I&AP DATABASE.pdf |
Download |
ITB Consent.pdf |
Download |
PPP Report Emergency Nondabula Water Reticulation.pdf |
Download |
RHDHV - Issues Trail Emergency Nondabula_cBAR Final PP Doc.pdf |
Download |
Traditional Council Consent_07 July 2015.pdf |
Download |
Traditional Council Consent_15 June 2015.pdf |
Download |
APPENDIX F: IMPACT ASSESSMENT |
|
APPENDIX F.pdf |
Download |
APPENDIX G: DRAFT EMPr |
|
RHDHV - Emergency Nondabula EMPr_Final cBAR EMPr.pdf |
Download |
APPENDIX H: DETAILS OF EAP |
|
Details of EAP & Declaration.pdf |
Download |
CVs |
|
Bassa_Humayrah_RHDHV_2015.pdf |
Download |
Griffiths_Bronwen_RHDHV_2015.pdf |
Download |
Hoffmann_Bjorn_RHDHV_2015.pdf |
Download |
Qualifications |
|
Professional Registration |
|
BRONWEN GRIFFITHS - MSc & SACNASP.pdf |
Download |
Tertiary |
|
BJORN HOFFMANN.pdf |
Download |
BRONWEN GRIFFITHS - MSc & SACNASP.pdf |
Download |
HUMAYRAH BASSA.pdf |
Download |
APPENDIX I: SPECIALISTS DECLARATION OF INTEREST |
|
Declaration _Wetland.pdf |
Download |
Declaration_Ecological.pdf |
Download |
Declaration_Geohydrological.pdf |
Download |
Declaration_Heritage.pdf |
Download |
Declaration_Peer Reviewer.pdf |
Download |
APPENDIX J: ADDITIONAL INFORMATION |
|
CMS_Watercourse Crossings_Emergency Nondabula.pdf |
Download |
Preliminary Design Report_20141007.pdf |
Download |
Stormwater Management Plan.pdf |
Download |
ENVIRONMENTAL SCOPING REPORT FOR THE CHARLIE 1 LANDFILL OPTIMISATION AND STORMWATER MANAGEMENT PROJECT, SASOL SYNFUELS, SECUNDA, MPUMALANGA
Comment Period: 14 August – 14 September 2015
Documents |
|
Charlie 1 Draft ESR_for review_final |
Download |
Appendix A Locality Map |
Download |
Appendix B EAP CVs |
Download |
Appendix C Charlie 1 Landfill Permit |
Download |
Appendix D Public Participation Documents |
Download |
Appendix E Wetland Verification Exercise |
Download |
Appendix F Ecological Survey |
Download |
Southern Waste Water Treatment Works: Application for Coastal Waters Discharge Permit
Client: eThekwini Municipality
Comment Period: 29 July – 7 September 2015
Documents |
|
Draft CWDP Application Form_no Annex_3 July 2015 |
Download |
Annexure A: Draft CWDP Application_Annexure A_3 July 2015 |
Download |
Annexure B: Draft CWDP Application_Annexure B_3 July 2015 |
Download |
Annexure C: Draft CWDP Application_Annexure C_3 July 2015 |
Download |
Final Environmental Impact Assessment Report for the Proposed Continuous Ash Disposal Facility for the Matimba Power Station in Lephalale, Limpopo Province (DEA Ref 14/12/16/3/3/3/56)
Review and Commenting Period: 23 July – 12 August 2015
BASIC ASSESSMENT REPORT FOR THE DISMANTLING OF A PORTION OF THE EXISTING DOUBLE-CIRCUIT POWER LINE AND THE CONSTRUCTION OF TWO (2) 7 KM LONG 88 KV POWER LINES WITHIN A 2 KM CORRIDOR BETWEEN GROOTPAN AND BRAKFONTEIN SUBSTATIONS NEAR OGIES, MPUMALANGA (DEA REF: TBA)
Review and Commenting Period: 10 July – 11 August 2015
APPLICATION FOR AN ATMOSPHERIC EMISSIONS LICENCE FOR THE BON ACCORD QUARRY ASPHALT PLANT, CITY OF TSHWANE (GDARD REF: 003/15-16/A0001)
Review and Commenting Period: 9 July – 7 August 2015
Documents |
|
AEL Application Form for GDARD Licensing Authority |
Download |
Bon Accord AQIA |
Download |
ENVIRONMENTAL AUTHORISATION (SCOPING/ENVIRONMENTAL IMPACT REPORTING PROCESS) FOR THE PROPOSED SOLAFRICA SAND DRAAI PV PLANT WITHIN THE !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE
Review Period: 03 July 2015 to 03 August 2015
Documents |
|
SandDraai Solafrica PV ESR_Draft |
Download |
Appendix A: Advert & Notice Letter |
|
Advert - 30DayComment_PV_26 06 15(Final) |
Download |
I&AP Notice: SandDraai notification letter_Final & SandDraai_letter(Finaal)Afr |
Download
Download
|
Appendix B BID |
|
SolAfrica_BID (ESS)_2014.09.08Final & SolAfrica_BID (ESS)_final (afrikaans)_2014.09.17 |
Download
Download
|
Appendix C Site Notice |
|
SandDraai_site notice_ESS_PV |
Download |
Appendix E Specialist Reports |
|
Air Quality - Draft Scoping Report |
Download |
EnvirossCC_Sanddraai_AquaticSurvey |
Download |
REPORT GROBLERSHOOP SANDDRAAI 391 ROYAL HASKON 2014 |
Download |
Sand Draai Bird Scoping Report |
Download |
Sand Draai CSP Preliminary Ecological Survey |
Download |
Sand Draai Hydrogeological Scoping Report |
Download |
Sanddraai Visual Report |
Download |
SIA Baseline report1 |
Download |
SolAfrica Sand Draai Noise Scoping Report |
Download |
Surface Water Study |
Download |
Waste Impact Report |
Download |
Appendix H I&AP Database |
|
SolAfrica CSP_I&AP Database_2015.07.01 |
Download |
INTEGRATED ENVIRONMENTAL AUTHORISATION AND WASTE MANAGEMENT LICENCE (SCOPING/ENVIRONMENTAL IMPACT REPORTING PROCESS) FOR THE PROPOSED SOLAFRICA SAND DRAAI CSP PLANTS WITHIN THE !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE
Review Period: 03 July 2015 to 03 August 2015
Documents |
|
SandDraai Solafrica CR ESR_Draft |
Download |
SandDraai Solafrica PB ESR_Draft |
Download |
Appendix A: Advert & Notice Letter |
|
Advert - 30DayComment_CSP_26 06 15(Final) |
Download |
I&AP Notice: SandDraai notification letter_Final & SandDraai_letter(Finaal)Afr |
Download
Download
|
Appendix B BID |
|
SolAfrica_BID (ESS)_2014.09.08Final |
Download |
SolAfrica_BID (ESS)_final (afrikaans)_2014.09.17 |
Download |
Appendix C Site Notice |
|
SandDraai_site notice_ESS_CR |
Download |
SandDraai_site notice_ESS_PT |
Download |
Appendix E Specialist Reports |
|
Air Quality - Draft Scoping Report |
Download |
EnvirossCC_Sanddraai_AquaticSurvey |
Download |
REPORT GROBLERSHOOP SANDDRAAI 391 ROYAL HASKON 2014 |
Download |
Sand Draai Bird Scoping Report |
Download |
Sand Draai CSP Preliminary Ecological Survey |
Download |
Sand Draai Hydrogeological Scoping Report |
Download |
Sanddraai Visual Report |
Download |
SIA Baseline report1 |
Download |
SolAfrica Sand Draai Noise Scoping Report |
Download |
Surface Water Study |
Download |
Waste Impact Report |
Download |
Appendix H I&AP Database |
|
SolAfrica CSP_I&AP Database_2015.07.01 |
Download |
Final Environmental Scoping Report for the Proposed Full-Scale Composting of Sludge Waste Streams at Sasol Secunda, Mpumalanga (DEA Ref: 12/9/11 L45317/6; MDARDLEA Ref: 17/2/3 GS-277)
Review and Commenting Period: 24 June – 25 July 2015
NOTICE OF ENVIRONMENTAL AUTHORISATION: BASIC ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A 18 KM 132 kV POWER LINE FROM THE EXISTING MBUMBU SUBSTATION TO THE NEW TSAKANI SUBSTATION, BUSHBUCKRIDGE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE (DEA REF: 14/12/16/3/3/1/1291)
In terms of Regulation 60(1) of the EIA Regulations (2010), any person wishing to appeal the granting of this EA must lodge a notice of intention to appeal with the Minister, within 20 days after the date of the decision i.e. 02 June 2015
Documents |
|
Environmental Authorisation for the Mbumbu Project |
Download |
PROPOSED SOLIDS REMOVAL AND TREATMENT FACILITIES UPGRADE AT
SOUTHERN WASTE WATER TREATMENT WORKS, MEREWENT,
IN ETHEKWINI METROPOLITAN MUNICIPALITY
EDTEA REF NO: DM/0032/2014
WASTE MANAGEMENT REFERENCE NO: DM/WML/0050/2014
WUL REFERENCE NO: 11/U60G/H/1623
CWDP REFERENCE NO: 2013/005/KZN/EThekwini Municipality Southern WWTW
DWA EXEMPTION NO: 1747B
Classified as a Major Hazardous Installation
Notice is hereby given in terms of the Environmental Impact Assessment (EIA) Regulations (2010) published in Government Notice No.R543 to No.R545, in terms of Section 24 (5) of the National Environmental Management Act (Act No 107 of 1998) (as amended), the National Environmental Management Waste Act (Act No 59 of 2008), the National Environmental Management: Integrated Coastal Management Act (Act No 44 of 2008) and the National Water Act (Act 36 No of 1998) of the initiative by the eThekwini Municipality, Water and Sanitation Department, to undertake the Solids Removal and Treatment Facilities Upgrades at the Southern Waste water Treatment Works (SWWTW) in Merewent, KwaZulu-Natal Province.
In respect of the above, the applicant, eThekwini Municipality is undertaking the general EIA and Waste Management License (WML) processes. The Scoping phase was carried out in 2014, with approval of the resultant Scoping Report and plan for the next phase of the process, being obtained in December 2014. This process is as contemplated in the EIA Regulations for the process of applying for authorisation for the above proposed development to the Competent Authority, the KwaZulu-Natal Department of Economic Development, Tourism & Environmental Affairs (KZN edtea), as well as a WML application in terms of Section 19(2) of the National Environmental Management: Waste Act (Act No 59 of 2008).
Client: AECOM via eThekwini Water and Sanitation
Comment Period: 22 April 2015 – 31 May 2015
Draft Environmental Scoping Report for the Proposed Full-Scale Composting of Sludge Waste Streams at Sasol Secunda, Mpumalanga (DEA Ref: 12/9/11 L45317/6; MDARDLEA Ref: 17/2/3 GS-277).
Review and Commenting Period: 05 May – 15 June 2015
DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED TINLEY MANOR SOUTHBANKS COASTAL DEVELOPMENT – INVITATION TO COMMENT KZN EDTEA REFERENCE NUMBER: DC29/0019/2011
Description:
Tongaat Hulett Developments propose to develop the Tinley Manor Southbanks Coastal Development into a mixed-use coastal development including a large residential component. Tinley Manor Southbanks is an approximately 480 ha site, located between the coastal towns of Tinley Manor and Sheffield Beach within the KwaDukuza Municipality, KwaZulu-Natal.
Tongaat Hulett Developments has appointed Royal HaskoningDHV (previously known as SSI Engineers and Environmental Consultants) to act as the independent Environmental Assessment Practitioner (EAP) for the Environmental Impact Assessment (EIA) study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2010), please find attached a draft Environmental Impact Assessment Report and associated documents for your review and comment. Please be informed that the period for review is 40 calendar days from 30 March 2015 to 18 May 2015.
Please submit all comments pertaining to the document on or before 18 May 2015.
Client: Tongaat Hulett Developments
FINAL Basic Assessment for the Eskom 132kV Power Line from Mbumbu Substation to the Proposed Tsakani Substation, 13 MARCH 2015 to 03 APRIL 2015
Documents |
|
Mbumba Final Basic Assessment Report (Mbumba Final BAR) |
Download |
Appendix A - Locality Maps (Maps) |
Download |
Appendix B - Photographs |
Download |
Appendix C - Facility Illustrations |
Download |
Appendix D - Specialist Reports |
Download |
Appendix E - Public Participation |
Download |
Appendix F - Impact Assessment |
Download |
Appendix G - EMPr (Environmental Management Plan report) |
Download |
Appendix H - Details of EAP (Environmental Assessment Practitioner) |
Download |
Appendix I - Specialist Declaration |
Download |
Appendix J - Additional Information |
Download |
NOTIFICATION RE: THE PROPOSED COMPENSATION INDUSTRIAL AND BUSINESS ESTATE ENVIRONMENTAL IMPACT ASSESSMENT
Project Title: The Compensation Industrial and Business Estate Addenda
Client: Tongaat Hulett Developments
Applicant: Tongaat Hulett Developments
EAP: Royal HaskoningDHV
Background: The history of the submission of this application is as follows. The Final EIAR was submitted to the Department of Agriculture and Environmental Affairs (DAEA) (then the Department of Agriculture, Environmental Affairs and Rural Development), on 12 March 2012. A letter of rejection dated 01 June 2012 was issued by the DAEA. An addendum addressing the specifics of this letter was submitted on 24 January 2013 (Addendum 1). Subsequent to this, Addendum 1 was rejected by the DAEA. Addendum 2 has now been submitted to the Department of Economic Development, Tourism and Environmental Affairs (EDTEA). Provided on our website are both addenda one and two together with appendices. Furthermore, the amended EMPr and Final EIA Report (FEIAR) can be found as “Addendum 2 Appendix E” and “Addendum 2 Appendix F.” The amended Final EIAR serves to incorporate the updates and changes requested.
Documents |
|
ADDENDUM 1 |
|
EIAR ver 3 Final |
Download |
Appendix A1 - Concept Plan |
Download |
Appendix A2 - Layout Plan |
Download |
Appendix A3 - Detailed Land Use Paper |
Download |
Appendix B - Need and Desirability Report |
Download |
Appendix C - Sanitation Service Level Agreement |
Download |
Appendix E - Water Service Level Agreement |
Download |
Appendix F - Amended EMP |
Download |
Appendix G1 - Response Letter to Wetland Assessment Queries |
Download |
Appendix G2 - Omitted appendix A of Wetland Assessment |
Download |
Appendix G3 - Wetland rehabilitation |
Download |
Appendix G4 - Wetland Delineation & Management Report |
Download |
Appendix H - Updated Issues Trail |
Download |
Appendix I - EKZNW Comment |
Download |
Appendix J - KZN DAEA Rejection of final EIAR |
Download |
ADDENDUM 2 |
|
Second Addendum |
Download |
Second Addendum cover letter |
Download |
Appendix A - Amended Layout Plan |
Download |
Appendix B - Lany Use Paper2 |
Download |
Appendix C - KLM Letter in Principle for Electricity Provision |
Download |
Appendix D - Collated Final |
Download |
Appendix E - Amended EMPr as per DQEQ |
Download |
Appendix E - Noise Management |
Download |
Appendix E - SOP Control of Alien Invasives |
Download |
Appendix E - SOP Dust Management |
Download |
Appendix E - SOP Emergency Responses |
Download |
Appendix E - SOP EMP Monitoring |
Download |
Appendix E - SOP Erosion Control |
Download |
Appendix E - SOP Raw Material Sourcing |
Download |
Appendix E - SOP Spill Contingency Plan |
Download |
Appendix E - SOP Stormwater |
Download |
Appendix E - Stormwater Management Plan |
Download |
Appendix E - Wetland Rehabilitation Plan |
Download |
Appendix F - Amended Final Plan |
Download |
Appendix G - DQEQ Rejectino of Addendum |
Download |
Appendix H - Compensation Request |
Download |
Appendix I - Issues Trail - CIBE |
Download |
Appendix J - Comment from DoT |
Download |
Appendix K - Notification to I&APs |
Download |
Appendix L2 - I&AP |
Download |
Basic Assessment for the proposed construction of an 18km 132kV power line from the existing Mbumbu Substation to the new Tsakani Substation, Bushbuckridge Local Municipality, Mpumalanga (DEA Ref: 14/12/16/3/3/1/1291)
Review and Comment Period: 08 December 2014 – 06 February 2015
Projects
| |
Mbumbu Draft BAR_Final_021214 |
Download |
Appendix A |
Maps |
Download |
Appendix B |
Photographs |
Download |
Appendix C |
Facility Illustration |
Download |
Appendix D |
Specialist Studies_Part1 (Avifauna, Ecological, Heritage, Social) |
Download |
Specialist Studies_Part2 (Social cont., Surface Water, Visual) |
Download |
Appendix E |
Public Participation |
Download |
Appendix F |
Impact Assessment |
Download |
Appendix G |
EMP Report |
Download |
Appendix H |
Details of EAP |
Download |
Appendix I |
Specialist Declaration |
Download |
Appendix J |
Additional Information |
Download |
FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CORNUBIA MIXED USE PHASED DEVELOPMENT, PHASE 2 – INVITATION TO COMMENT KZN EDTEA REFERENCE NUMBER: DM/0030/2012
Tongaat Hulett Developments in conjunction with eThekwini Municipality propose to develop a mixed use, phased development on Cornubia, a 1333 ha Greenfield’s site, located west of the N2 toll road and north of the Mount Edgecombe/ M41 freeway within eThekwini Municipality.
Tongaat Hulett Developments and eThekwini Municipality have appointed Royal HaskoningDHV to act as the independent Environmental Assessment Practitioner (EAP) for the Environmental Impact Assessment (EIA) study.
In line with the requirements of the National Environmental Management Act (Act No 107 of 1998) (NEMA) (as amended) and the EIA Regulations (2010), please find attached the final Environmental Impact Assessment Report and associated documents for your review and comment. Please be informed that the period for review is 21 calendar days from 25 February 2015 to 18 March 2015.
Please submit all comments pertaining to the document on or before 18 March 2015.
Clients: Tongaat Hulett Developments and eThekwini Metropolitan Municipality
Documents |
|
Main Report |
Download |
Appendix A |
A - Acceptance of Environmental Scoping Report |
Download |
Appendix B |
B – Draft Environmental Management Programme |
Download |
B1 – THD Standard Operating Procedures |
Download |
B2 – Wetland and Open Space Rehabilitation Plan |
Download |
B3 – Stormwater Management Plan |
Download |
B4 – Soil Management Framework Strategy |
Download |
Appendix C |
C1 – Agricultural Potential Assessment and Action Plan for the Loss of Agricultural Land |
Download |
C2 – Geotechnical Investigation |
Download |
C3.1 – Heritage Assessment |
Download |
C3.2 – Heritage Buildings Assessment |
Download |
C4 – Vegetation Assessment |
Download |
C5.1 – Wetland Assessment |
Download |
C5.2 – Wetland Interchange Assessment |
Download |
C6 – River and Estuary Assessment |
Download |
C7 – Social Impact Assessment |
Download |
C8 – Socio-economic Report |
Download |
C9.1 – Traffic Impact Assessment |
Download |
C9.2 – TIA Addendum |
Download |
C10 – Urban Planning Report |
Download |
C11 – Engineering Services Report |
Download |
C12 – Electrical Services Report |
Download |
C13 – Attenuation Facilities within Wetlands Report |
Download |
C14 – Irrigation Services Report |
Download |
Appendix D |
D – Memorandum of Agreement between the Applicants |
Download |
Appendix E |
E - Company Profile and CVs of the Environmental Assessment Practitioner |
Download
Download
Download
Download
Download
|
Appendix F |
F – Layout Plans |
Download
Download
Download
Download
|
Appendix G |
G – Service Level Agreements |
Download |
Appendix H |
H1 – Public Participation Summary Report |
Download |
H2 –Comments & Responses Report |
Download |
FINAL BASIC ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF A 3 KM PIPELINE AND ASSOCIATED INFRASTRUCTURE ON PORTIONS 0 AND 5 OF FARM SAND DRAAI 391, NEAR GROBLERSHOOP, NORTHERN CAPE: DEA REF 14/12/16/3/3/1/1214
Virginia Beach Proposed Beach Boma Basic Assessment
Client: eThekwini Municipality
Comment Period: 22 September -13 October 2014
Projects
| |
Virginia Beach Boma Assessment Report |
Download |
Appendix A |
Appendix A1 Virginia extension_Rev4_option 1.pdf |
Download |
Appendix A2A Virginia extension_Rev3_option 2A_10-09-2014.pdf |
Download |
Appendix A2B Virginia extension_Rev3_option 2B_10-09-2014.pdf |
Download |
Appendix A3A Virginia extension_Rev3_option 3A_10-09-2014.pdf |
Download |
Appendix A3B Virginia extension_Rev3_option 3B_10-09-2014.pdf |
Download |
Appendix B |
Appendix B Site Photographs.pdf |
Download |
Appendix C |
Appendix C Facility Impressions.pdf |
Download |
Appendix D |
Appendix D1 Veg Specialist declaration_front page_EDTEA.pdf |
Download |
Appendix D2 Virginia Airport Vegetation Mapping Report.pdf |
Download |
Appendix D3 Vegatation Mapping Virgnia.pdf |
Download |
Appendix D4 Beach_Survey_July_2014_Report.pdf |
Download |
Appendix D5 Enviromap_Sediment_Report_Virginia_Aug_2014.pdf |
Download |
Appendix D6 BoreholePlot.pdf |
Download |
Appendix E |
Appendix E1 Beach Boma BID_v8.pdf |
Download |
Appendix E2 Beach Boma poster.ver1.pdf |
Download |
Appendix E3 Proof of site notice.pdf |
Download |
Appendix E4 Newspaperproof.pdf |
Download |
Appendix E5 Beach Boma Advert.ver3.pdf |
Download |
Appendix E6 Beach Boma I&AP Database ver2_active.pdf |
Download |
Appendix E7 Comments&Responses.pdf |
Download |
Appendix E8 20 UEDE_Response.pdf |
Download |
Appendix E9 AKader_comments_captured.pdf |
Download |
Appendix E10 BCalvert_comments_captured.pdf |
Download |
Appendix E11 CCorreia_comments_captured.pdf |
Download |
Appendix E12 Coastwatch_BAR Virginia Beach Facilities_comments_captured.pdf |
Download |
Appendix E13 DAFF_dBAR Comment_comments_captured.pdf |
Download |
Appendix E14 DWA BAR Virginia Beach_comments_captured.pdf |
Download |
Appendix E15 eThek_Consolidated comment_comments_captured.pdf |
Download |
Appendix E16 Kirby_DCC1252-27 Comments on BAR_comments_captured.pdf |
Download |
Appendix E17 MDeWet_comments_captured.pdf |
Download |
Appendix E18 SRiley_comments_captured.pdf |
Download |
Appendix E19 FEDHASA_comments_captured.jpg |
Download |
Appendix E20 Vegetation Specialist_Response.pdf |
Download |
Appendix E21.Coastal Erosion Mather_Response.pdf |
Download |
Appendix F |
Appendix F1 Virginia Beach Proposed Beach Boma – Draft EMPr_V5.pdf |
Download |
Appendix F2 Draft Stormwater Management Plan_Virginia Upgrades.pdf |
Download |
Appendix F3 Virginia extension_Rev4-Layout1 - Stormwater.pdf |
Download |
Appendix G |
Appendix G1 Virginia Beach TIA Draft 05-06-2014.pdf |
Download |
Appendix G2 News Article_1.pdf |
Download |
Appendix G3 News Article_2.pdf |
Download |
Draft Basic Assessment Report for the proposed Construction of a 3km Pipeline and Associated Infrastructure on Portions 0 and 5 of Farm Sand Draai391, near Upington (Groblershoop), Northern Cape (DEA REFERENCE: 14/12/16/3/3/1/1214)
Comment period: 16 September 2014 to 26 October 2014
Projects
| |
Cover Letter |
Download |
Draft Bokpoort Basic Assessment Report |
Download |
Appendix A |
Appendix A1 – Locality Map |
Download |
Appendix A2 – Sensitivity Map: Watercourses |
Download |
Appendix A3 – Sensitivity Map: Critical Biodiversity |
Download |
Appendix B |
Appendix B1 – Site Photographs |
Download |
Appendix B2 – Site Photographs |
Download |
Appendix C |
Appendix C1 – Preferred |
Download |
Appendix C2 – Approved A |
Download |
Appendix C3 – Approved B |
Download |
Appendix D |
Appendix D1 – Heritage |
Download |
Appendix D2a – Biodiversity |
Download |
Appendix D2b – Aquatic Ecological |
Download |
Appendix D3 - Surface Water Study |
Download |
Appendix E |
Appendix E1 – Public Participation Report |
Download |
Appendix E2 – I&AP Correspondence |
Download |
Appendix F - H |
Appendix F – Impact Assessment |
Download |
Appendix G – Draft EMP Report |
Download |
Appendix H – Details of EAP |
Download |
Appendix I - J |
Appendix I1 – Biodiversity Report |
Download |
Appendix I2 – Wetland Report |
Download |
Appendix I3 – Heritage Report |
Download |
Appendix J – DWS Temp Approval Letter |
Download |
Rea Vaya BRT Phase 1C Section 8
Projects
| |
Rea Vaya BRT Phase 1C Section 8 |
Download |
Rea Vaya BRT Phase 1C Section 8 A Layout and Drainage Plans |
Layout Plan 1 |
Download |
Layout Plan 2 |
Download |
Rea Vaya BRT Phase 1C Section 8 B Layout and Drainage Plans |
Layout Plan 1 |
Download |
Layout Plan 2 |
Download |
Layout Plan 3 |
Download |
Rea Vaya BRT Phase 1C Section 8 C Layout and Drainage Plans |
Layout Plan 1 |
Download |
Layout Plan 2 |
Download |
Layout Plan 3 |
Download |
Layout Plan 4 |
Download |
Layout Plan 5 |
Download |
The SWWTW Solids Removal and Treatment Facilities Upgrade EIA and WML: Final Scoping Report and Plan of Study
Client: AECOM
Comment Period : 05 September -26 September 2014
Projects
| |
fSR - SWWTW -SRTFU |
Download |
Appendix A: Upfront Authority Correspondence |
A1 – Clarification From DEA |
Download |
A2 – Clarification From (The Then) DAEA |
Download |
A3 – Permission From DAEA To Upscale |
Download |
A4 – Acceptance Of Application And Issue Of Reference Numbers |
Download |
Appendix B: Public Participation Report |
B1 – Public Participation Summary |
Download |
B2 – Proof Of Advertisement |
Download |
B3 – Proof Of Site Notices |
Download |
B4 – Background Information Documents And Distribution Photo Log |
Download |
B5 –Introductory Meeting |
Download |
B6 – Focus Group Meeting – Invitation, Presentation, Register, Minutes |
Download |
B7 – Public Meeting-Invitation, Presentation, Register, Minutes |
Download |
B8 – Project I&Ap Database |
Download |
B9 – Issues Trail + All Comments |
B9 – Issues Trail + All Comments |
Download |
B9 – Issues Trail + All Comments |
Download |
B9 – Issues Trail + All Comments |
Download |
Appendix C – Specialist Reports |
C1 – Biodiversity Baseline Report |
Download |
C2 – Social Baseline Report |
Download |
C3 - Mhi Letter |
Download |
C4 – Air Quality Baseline Report |
Download |
C5 – Heritage Impact Assessment |
Download |
Appendix D – Drawings |
D1 – Drawings |
Download |
D2 – Drawings |
Download |
D3 – Drawings |
Download |
D4 – Drawings |
Download |
Appendix E |
Download |
PFG Building Glass
Comment Period : 11 August -19 September 2014
Projects
| |
Air Quality Impact Assessment for the PFG Building Glass |
Download |
DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE INTEGRATED ENVIRONMENTAL AUTHORISATION ASSOCIATED WITH THE UNDERGROUND COAL GASIFICATION PILOT PROJECT AND ASSOCIATED INFRASTRUCTURE IN SUPPORT OF CO-FIRING OF GAS AT THE MAJUBA POWER STATION, AMERSFOORT, MPUMALANGA
Comment Period : 18 July -26 August 2014
Projects
| |
FINAL_MASTER EIR Draft_Public Review |
Download |
Appendix A – Locality and Layout Maps (Roodekopjes) |
Download |
Appendix B – IWWMP |
Download |
Appendix C – Cofiring correspondence |
Download |
Appendix D – Internal road network |
Download |
Appendix E - Mining options |
Download |
Appendix F – Authority consultation |
Download |
Appendix G – I&AP database and Issues Trail |
Download |
Appendix H – Hydrogeology |
Download |
Appendix I – Hydrology |
Download |
Appendix J – Wetlands |
Download |
Appendix K – Freshwater Ecology |
Download |
Appendix L – Soils & Agric Potential |
Download |
Appendix M – Biodiversity |
Download |
Appendix N – Waste |
Download |
Appendix O – Social |
Download |
Appendix P – Air Quality |
Download |
Appendix Q – Heritage & Palaeo |
Download |
Appendix R – Visual |
Download |
Appendix S – Irrigation Plan |
Download |
Appendix T – Environmental Management Plan report |
Download |
FINAL BASIC ASSESSMENT REPORT FOR THE PROPOSED UPGRADE TO THE EASTBURY SEWER LINE, PHOENIX, ETHEKWINI MUNICIPALITY – INVITATION TO COMMENT KZN DED TEA REFERENCE NUMBER: DM/0045/2014
Client: eThekwini Metropolitan Municipality
Description:
A portion of the trunk sewer along the alignment of Eastbury Drive in Phoenix linking portions of Phoenix, Mt Edgecombe and Cornubia to the KwaMashu Wastewater Treatment Works (WWTW) has been found to be below the required capacity and thus requires an upgrade. The proposed upgrade involves the installation of approximately 1.1 km of sewer line with a diameter of approximately 750 mm, adjacent to the existing pipeline alongside Eastbury Drive.
In respect of the above, the applicant, eThekwini Municipality intends to undertake a Basic Assessment process as contemplated in the EIA Regulations for the process of applying for authorisation for the above proposed development to the Competent Authority, the KwaZulu-Natal Department of Economic Development, Tourism and Environmental Affairs (KZN EDTEA).
In line with the requirements of the EIA Regulations (2010) promulgated under the National Environmental Management Act (NEMA)(as amended) please find attached the draft Basic Assessment Report for your review and comment.
Projects
| |
Eastbury Sewer Final BAR |
Download |
Appendix A – Site Plan |
Download |
Appendix B – Site Photographs |
Download |
Appendix C – Facility Illustration |
Download |
Appendix D |
Appendix D1 – Wetland Assessment External Review Letter |
Download |
Appendix D2 – Wetland Assessment Report |
Download |
Appendix D3 – Eastbury Sewer Wetlands Report Peer Review |
Download |
Appendix E |
Appendix E1 – PPP Summary Report |
Download |
Appendix E2 – Comments & Responses Report |
Download |
Appendix F |
Appendix F – Draft EMPr |
Download |
Appendix F – Spill Contingency Plan |
Download |
SWWTW EIA
Client: AECOM via eThekwini Water and Sanitation
Comment Period: 23 May 2014 – 2 July 2014
Description:
The Southern Waste Water Treatment Works Solids Removal and Treatment Facilities Upgrades, Environmental Impact Assessment and Waste Management Licence Notice is hereby given in terms of the Environmental Impact Assessment Regulations (2010) published in Government Notice No.R543 to No.R545, in terms of Section 24 (5) of the National Environmental Management Act (Act No 107 of 1998)(as amended) and the National Environmental Management Waste Act (Act No 59 of 2008), of the initiative by The eThekwini Municipality, Water and Sanitation Department, to undertake the Solids Removal and Treatment Facilities Upgrades at the Southern Waste water Treatment Works (SWWTW) in Merewent, KwaZulu-Natal Province.
Projects
| |
Draft Scoping Report and Plan of Study |
Download |
Appendix A - Upfront Authority Correspondence |
A1 - Clarification From DEA |
Download |
A2 - Clarification From DAEA |
Download |
A3 - Permission From DAEA to Upscale |
Download |
A4 - Acceptance of Application and Issue of Reference Numbers |
Download |
Appendix B - Public Participation Report |
B1 - Public Participation Summery |
Download |
B2 - Proof of Advertisment |
Download |
B3 - Proof of Site Notices |
Download |
B4 - Background Information Documents |
Download |
B5 - Introductory Meeting |
Download |
B6 - Project I&AP Database |
Download |
B7 - Issues Trail and Comments Recieved |
B7 - Issues Trail |
Download |
B7 - Comments Recieved |
Download |
Appendix C - Specialist Reports |
C1 - Biodiversity Baseline Report |
Download |
C2 - Social Baseline Report |
Download |
C3 - MHI Letter |
Download |
C4 - Air Quality Baseline Report |
Download |
C5 - Heritage Impact Assessment |
Download |
Appendix D - Drawings |
D1 - Scope of Works |
Download |
D2 - Road Design 1 |
Download |
D3 - Road Design 2 |
Download |
D4 - Road Design 3 |
Download |
Appendix E - Additional Reports |
E1 - CSIR Report |
Download |
Draft Environmental Impact Report for the Waste Recovery, Treatment and Temporary Storage Facilities at the BMW Production Plant, Rosslyn, Gauteng”
Rea vaya brt phase 1C Traffic configuration Plans
Final Basic assessment report for the proposed eskom luiperdshoek 33kv powerline project, pofadder, northern cape province.
Public Comment Period: 13 January to 3 February 2014
Projects
| |
Basic assessment report - 07 January 2014 |
Download |
Appendix A |
Appendix A1 - Locality Map |
Download |
Appendix A2 - Sensitivity Map |
Download |
Appendix B Photographs - Luiperdshoek Site Photos document |
Download |
Appendix C |
Appendix C1 - 1745 |
Download |
Appendix C2 - 1778 1-60 deg |
Download |
Appendix D |
Appendix D1 Ecological Study - Luiperdshoek Preliminary Ecological Survey |
Download |
Appendix D2 Aquatic Study - Luiperdshoek Aquatics and wetlands delineation report |
Download |
Appendix D3 Heritage Study - Archaeological study |
Download |
Appendix D4 Avifauna Study -Luiperdshoek Avifaunal Report Rev.1 Apr-13 |
Download |
Appendix E |
Appendix E1 Proof of Site Notice placement - Luiperdshoek Site Notices |
Download |
Appendix E2 I&AP Notification |
Gemsbok Tear sheet |
Download |
Letter from municipality |
Download |
Letter to I&AP's Luiperdshoek |
Download |
Appendix E3 Comments and Responses |
Comments from Coboop community |
Download |
Comments from Dept of Agriculture |
Download |
Comments from municipality |
Download |
Cooboop community traslated comment |
Download |
Issues Trail_Luiperdshoek (11 Nov 2013) |
Download |
SAHRA final comment Luiperdshoek 33kv Power Line, Northern Cape |
Download |
Appendix E4 Municipal Notification - Letter from municipality |
Download |
Appendix E5 - Database |
Download |
Appendix E6 Minutes of the Focus group Meeting |
Luipershoek Boerdery -Minutes Rev4 - 08Nov2013(Afr-Engl) |
Download |
Meeting Attendance register |
Download |
Appendix F Environmental Management Programme (EMPr) - Final EMPr 09 Jan 14 |
Download |
The compensation industrial and business estate addenda
Client: Tongaat Hulett Developments
Applicant: Tongaat Hulett Developments
Project Background:
The history of the submission of this application is as follows. The Final EIAR was submitted to the Department of Agriculture and Environmental Affairs (DAEA) (then the Department of Agriculture, Environmental Affairs and Rural Development), on 12 March 2012. A letter of rejection dated 01 June 2012 was issued by the DAEA. An addendum addressing the specifics of this letter was submitted on 24 January 2013 (Addendum 1). Subsequent to this, Addendum 1 was rejected by the DAEA. Addendum 2 is currently being developed for submission to the DAEA. Provided here for comment are both addenda one and two together with appendices. Furthermore, the amended EMPr and Final EIA Report (FEIAR) can be found below as “Addendum 2 Appendix E” and “Addendum 2 Appendix F.” The amended Final EIAR serves to incorporate the updates and changes requested.
Public Comment Period: 9 December 2013 - 17 January 2014
Projects
| |
A Addendum 1 to EIAR ver.3 FINAL January 2013 |
Download |
Appendix A |
Addendum 1 Appendix A1 - Concept Plan |
Download |
Addendum 1 Appendix A2 - Layout Plan |
Download |
Addendum 1 Appendix A3 - Detailed Land Use Paper |
Download |
Addendum 1 Appendix B - Need and Desirability Report |
Download |
Addendum 1 Appendix C - Sanitation Service Level Agreement |
Download |
Addendum 1 Appendix E - Water Service Level Agreement |
Download |
Addendum 1 Appendix F -Amended EMPr |
Download |
Appendix G |
Addendum 1 Appendix G1 - Response Letter to Wetland Assessment Queries |
Download |
Addendum 1 Appendix G2 - Omitted appendix A of Wetland Assessment |
Download |
Addendum 1 Appendix G3 - Wetland rehabilitation Plan |
Download |
Addendum 1 Appendix G4 - Wetland Delineation & Management Report |
Download |
Addendum 1 Appendix H - Updated Issues Trail |
Download |
Addendum 1 Appendix I - EKZNW Comment |
Download |
Addendum 1 Appendix J - KZN DAEA Rejection of final EIAR |
Download |
A Addendum 2 to CIBE FEIAR |
Download |
Addendum 2 Appendix A - Amended Layout Plan |
Download |
Addendum 2 Appendix B - Land Use Paper2 |
Download |
Addendum 2 Appendix D - collated |
Download |
Appendix E |
Addendum 2 Appendix E - Amended EMPr as per DAEA ver 7 |
Download |
Addendum 2 Appendix E - Stormwater Management Plan |
Download |
Addendum 2 Appendix F - 05.12. 2013 Amended FINAL EIAR for the Proposed CIBE |
Download |
Addendum 2 Appendix G - DAEA Rejection of Addendum 16.04.2013 |
Download |
The proposed ntatshana road, umzumbe local municipality
Client: PGA Consulting
Applicant: Umzumbe Local Municipality
Basic Assessment Report can also be found at:
• The Umzumbe Local Municipality, Kwa Hlongwa Community Hall , Umzumbe
• A copy will also be with Councillor Mthembu.
Project Background:
The proposed Ntatshana road is located in the rural area under a village called Maqhikizana within Umzumbe Local Municipality in Ward 08 on the Lower South Coast within the Ugu District Municipality Area in KwaZulu-Natal. There is no current access road between the D1050 and the D20 to the east and the site is currently accessed via the R612 and the D20. The Umzumbe Local Municipality proposes to develop the Ntatshana Road to be 2.2 km in length and 5 m in width. For the establishment of this gravel top road, the scope of work includes construction of the access road linking Maqhikizana and Mtwalume by means of a low level bridge to a high level bridge serving as a river crossing structure for residence and vehicles for flood 1:50 year return period. Two alternatives have been proposed.
The Basic Assessment (BA) process as well as a water use licence application in terms of Section 21 of the National Water Act (Act No 36 of 1998) is being undertaken for this proposed project.
Public Comment Period: 11 November 2013 till 08 January 2014.
The Proposed Mondi Mill Upgrade – Final BA Report.
This development is proposed to take place on a property in the Uthungulu District Municipality in KwaZulu-Natal. The Mondi Richards Bay mill was commissioned in 1984. It produces two key products: Baycel, a premier grade bleached hardwood pulp made from 100-percent eucalyptus fibre and Baywhite, a white top kraft linerboard.
It is proposed that an upgrade to the production facilities of the mill take place to increase the output to approximately 820 000 tons/annum. The current capacity of the mill is approximately 750 000 tons/annum. The upgrade will involve changes to existing equipment including modifications to the Recovery Boiler, washing and screening equipment as well as the pulp drying equipment. Two additional storage tanks for unbleached pulp and heavy black liquor will be installed and where possible equipment locations will be rationalised to reduce electrical power consumption and pumping systems. High efficiency motors designed to be energy efficient will be utilised in areas of the plant where debottlenecking is taking place and the use of renewable energy will be increased.
Open for public review and comment: 15 July - 29 July 2013.
DRAFT BASIC ASSESSMENT REPORT FOR THE TRUCK STOP WITH FILLING STATION AND ANCILLARY USES KNOWN AS MEERKAT TRUCKSTOP ON REMAINING EXTENT OF POTION 9 (A PORTION OF PORTION 5) OF THE FARM SMALKLOOF 122 REGISTRATION DIVISION HS SITUATED APPROXIMATELY 2 KM OUTSIDE VOLKSRUST, MPUMALANGA PROVINCE
Open for Public Review and Comment: 17 May 2013 – 25 June 2013
Projects
| |
Draft BA Report |
Download |
Appendix A - Conceptual Design |
Download |
Appendix B - Developement Motivation Memorandum |
Download |
Appendix C - Feasibility Study |
Download |
Appendix D - Minutes of IDP Representative Forum |
Download |
Appendix E - Acknowledgement letter from MDEDET |
Download |
Appendix F1 - Stakeholder Database |
Download |
Appendix F2 - Newspaper Advertisement |
Download |
Appendix F3 - Site Notice Photos |
Download |
Appendix G1 - Ecology |
Download |
Appendix G2 - Geohydrology |
Download |
Appendix G3 - Air Quality |
Download |
Appendix G4 - Heritage |
Download |
Appendix G5 - Geotech |
Download |
Appendix G6 - Traffic Count |
Download |
Appendix H - Envornmental Management Programme |
Download |
Draft Enviromental Scoping Report for the Proposed New Route r166 Mpumalanga Province.
Projects
| |
Draft Scoping Report |
Download |
Appendix A - Specialists Studies |
Download |
Appendix A1: Ecological survey |
Download |
Appendix A2: Heritage |
Download |
Appendix A3: Soils and agriculture |
Download |
Appendix A4: Noise |
Download |
Appendix A5: Social |
Download |
Appendix A6: Wetland assessment |
Download |
P166 study area map - Maggiesdal (Cadastral) |
Download |
P166 study area map - Maggiesdal (Aerials) |
Download |
P166 study area map - North (Cadastral) |
Download |
P166 study area map - North |
Download |
P166 study area map - Riverside Park (Aerials) |
Download |
P166 study area map - Riverside Park (Cadastral) |
Download |
P166 study area map - Rocky Drift (Aerials) |
Download |
P166 study area map - Rocky Drift (Cadastral) |
Download |
P166 study area map - South (Cadastral) |
Download |
P166 study area map - South |
Download |
P166 study area map - White River (Aerials) |
Download |
P166 study area map - White River (Cadastral) |
Download |
Eskom SOC
Project’s Descriptive Account: Eskom Distribution Northern Region has identified that the 132kV ring supply from Witkloof substation is experiencing low voltages due to the loss of either Witkloof Holnek 132kV line or Witkloof Wintershoek 132kV line voltages during the transmission and distribution. To rectify the status quo Eskom is proposing to construct a 26 km 132kV kingbird line from Bosloop Substation to Gumeni Main Transmission Station (MTS) and a 132kV feeder bay at Gumeni MTS and Bosloop Substation.
Open for Public Review: as at 26 January 2012 until 08 March 2012
Projects
| |
APPENDIX A - SITE PLANS |
Map 15092011 |
Download |
APPENDIX B - PHOTOS |
BAR Photos |
Download |
APPENDIX C - FACILITY ILLUSTRATION |
Hendrina SLD1 |
Download |
APPENDIX D - SPECIALIST STUDIES |
Bosloop Power line-Heritage |
Download |
Gumeni Aquatic Assessment_FINAL |
Download |
Gumeni_Bosloop_EWT_Avifaunal_Rev01 |
Download |
Gumeni-Bosloop Specialist Ecological Survey |
Download |
APPENDIX E - PUBLIC PARTICIPATION PROCESS |
Additional PPP |
Download |
PPP Correspondence |
Download |
APPENDIX F - EMPr |
EMPr |
Download |
|
Final Draft BAR Report |
Download |
Environmental Affairs
Basic Assessment for Phase 2 of the Durban Beachfront Upgrade: Country Club Beach to Blue Lagoon Beach
Project |
|
Draft Basic Assessment report - Draft Basic Assessment Report |
Appendix A: Site Plans |
Download |
Appendix B: Site Photographs |
Download |
Appendix C: Facility Illustrations |
Download |
Appendix D: Specialist Reports |
Download |
Appendix E: Comments and Response Report (to be added after public participation phase) |
Appendix F – Appendix F: Draft Environmental Management Programme |
Download |
Appendix G – Appendix G: Other Information and Motivation |
Download |